16
• The easiest way to install the tube will be to perform the following steps:
1- Using the metal clamp, attach the pre-cut tube with the appropriate size and shape
onto its final position in the loading mouth.
Figure 10
–
Installation of the loading tube and metal clamp.
2- Insert the assembly through the hole made in the wall with the above mentioned
measurement 330x330 mm, respecting the dimensions for its positioning indicated
above, it is necessary to fix the loading mouth.
3º- To be fixed to the wall, the loading system has four 6 mm holes in diameter. It is
recommended to use 8mm SX bushings for brick walls with 4.5 or 5.5 bolts and 8mm
HM bushes for plasterboard walls (Pladur) with the corresponding screws.
Figure 11
–
Mouthpiece installation
4º After fastening the loading piece, place the finishing frame with the cover. Fix the
frame by tightening the 4 load screws on the wall. The cover has a pin limiting its the
opening, as can be seen in the following figure, with a cut of the base assembly,
finishing ring and loading cover.
Содержание EARTH 9KW
Страница 10: ...9 General Measures Front Back Side Top Fire 9kW Earth 9kW Wind 9kW Figure 4 Insertable dimensions to pellets ...
Страница 35: ...34 a b Attention Do not use 90º curves c Figure 31 Examples of installations ...
Страница 101: ...100 ...
Страница 102: ...101 ...
Страница 103: ...102 ...
Страница 114: ...113 25 Annexes 25 1 Flow chart Lighting ...
Страница 115: ...114 ...
Страница 116: ...115 Disabling ...