13
and once in position, close them to ensure that the equipment is properly placed in the
working position.
Figure 9
–
Installation
•
Connect the power cord to a 230V 50Hz grounded outlet.
Figure 8
–
Electrical connection
•
After connecting the power cable to the silo column, it is necessary to attach the