Electrical Connection
Electrical Connection
7 Communication Cables Connection
7.1 Overview Of All Communication Cables Connection Methods
All communication cables will be done on the communication broad which
is in the wiring box.
Therefore this section will introduce the steps and requirements for all
communication cables connections.
Required wire size and torques
Ø
Removing the communication cover
Ø
Step1: Make sure the DC switch is in “OFF” position before removing the
communication cover.
Step2: Remove the 1 cover screws, then remove the communication broad.
Removing Communication Broad Cover Screw
Part
Required torque
Removing Conduit Fitting
Max. 13.8 lbf-in
Max. 13.8 lbf-in
Conduit installation and wiring routing
Ø
Operator should use the standard size conduit which must fit with the holes on the
bottom of the inverter. Conduit fittings need to be water tight.
Once the conduit and fittings are installed, wires will need to go through the
conduit and be locked into the corresponding terminals (refer to next section in
details).
It is recommended that all communication cables should be connected through
two conduits from the bottom right side of the inverter.
Note for specific wiring requirements, refer to Section 6.1.
For specific wire size and torques, refer to Section 6.1.
Wirings
Conduit
Conduits for
Electrical Connections
Conduits for
Communication
Connections
Terminals
Required Torque
Permitted Wire Size
LAN Terminal
BMS Terminal
Meter Terminal
Parallel 1 Terminal
Parallel 2 Terminal
WIFI Terminal
USB Terminal
RF Terminal
Type
RJ45
RJ45
RJ45
USB
RJ45
USB
USB
-
-
-
-
-
2.3 lbf-in
Plug-in
Plug-in
Plug-in
Plug-in
EPO Terminal
2.3 lbf-in
RJ45, 8-conductor
CAT5 non-crossover
20AWG
20AWG
2.3 lbf-in
3-pin Terminal block
6-pin Terminal block
RPSD Terminal
2-pin Terminal block
2.3 lbf-in
20AWG
Inside the Wiring Box
RPSD
Meter
Reserve
LAN
Parallel1
Parallel2
BMS
Communication Board
EPO
36
37