16 Filling the pellet storage area
15.1 Emission measurement for external
boilers
If necessary, use the menu
output test heating circuit
to carry out the emission measurement on an
external boiler. In this menu, the electrical outputs for
the external boiler, 3-way motor valve as well as for
the heating circuit pump and heating circuit mixing
valve can be switched on/off manually.
16 Filling the pellet storage area
Switch off the boiler before filling
i
For safety reasons, switch off the boiler
15 min. before filling (blowing in) the pellet sto-
rage area.
If item
House connection box for pellet filling
(item no. 6678) is used, this is done auto-
matically.
17 Messages
Messages that arise are shown in the
eco
manager-
touch
control display, each message is saved in the
message log
.
Abb. 2-60: Information window with message
Handling of messages
–
Button
1
: Close window, change to main screen.
The message remains active, i.e. the burner may
not start depending on the type of message.
–
Button
2
: Switch to the
message log
–
Button
3
: Acknowledge the message.
For some messages, an acknowledgement is
only possible if the cause of the fault has been rec-
tified; the burner may then restart after a heating
request is received.
A message is visible at the top edge of the main
screen until it is acknowledged
1
. Press to ack-
nowledge the message (information window opens)
Abb. 2-61
Alarm symbol
This symbol indicates an alarm message: The
boiler is no longer ready for operation if such a mes-
sage occurs.
Note symbol
This symbol indicates a notification message:
The boiler is still ready for operation.
Operation manual
pelletelegance
39