Chapter 2: Installing the Power Optimisers
Safety
WARNING!
When modifying an existing installation, turn OFF the inverter ON/OFF/P
switch and the AC circuit breaker on the main AC distribution panel.
CAUTION!
Power Optimisers are IP68/NEMA6P rated. Choose a mounting location where
Power Optimisers will not be submerged in water.
CAUTION!
The Power Optimiser must be operated according to the technical specifications
provided with the Power Optimiser.
CAUTION!
Cutting the Power Optimiser input or output cable connector is prohibited and
will void the warranty.
CAUTION!
All PV modules must be connected to a Power Optimiser.
CAUTION!
If you intend to mount the Power Optimisers directly to the module or module
frame, first consult the module manufacturer for guidance regarding the
mounting location and the impact, if any, on module warranty. Drilling holes in
the module frame should be done according to the module manufacturer
instructions.
Single Phase Energy Hub Inverter MAN-01-00812-1.1
14
Chapter 2: Installing the Power Optimisers