2. From the
Commissioning
screen, select
Device Manager > Add New Devices
.
3. Follow on-screen instructions.
To set up communication with the Energy Meter:
If you are setting up communication with the meter before the battery, first perform
Steps 1-3 above. After that, proceed with the steps below.
1. In the RS485-1 screen, select Add Modbus Device > Meter.
2. Set the Energy Meter’s CT Rating according to the CT specifications. If the CT rating
value returns to 0, check communication with the CT.
3. Select Meter 2 > Meter Function > Import (E+I).
Running a Battery Self-test
Run a battery self-test to check the battery's charge and discharge functionality.
To run a battery self-test:
1. Make sure the battery's circuit breaker switch is ON.
2. Switch the inverter ON/OFF/P switch to ON.
3. In SetApp, select
Commissioning > Maintenance > Diagnostics > Self-Test >
Battery Self-Test > Run Test
.
4. Wait for all tests to complete and check the results in the summary table.
If any of the tests have failed, see the table below for possible solutions:
Test Results
Solution
Charge failed
Check that the power and communication cables
between the battery and inverter are properly
connected.
Discharge failed
Check that the power and communication cables
between the battery and inverter are properly
connected.
Communication
Check that the communication cables between the
battery and inverter are properly connected.
Inverter switch is off
Switch the inverter ON/OFF/P switch to ON.
To show the last test results:
Select
Commissioning > Maintenance > Diagnostics > Self-Test > Battery Self-Test
> Show Last Results
.
Single Phase Energy Hub Inverter MAN-01-00812-1.1
44
Running a Battery Self-test