Malfunction

Possible Cause and Corrective Action

String Voltage is higher than number 

of Power Optimisers

WARNING!

If the measured voltage is too 
high, the installation may not 
have a safe low voltage. 
PROCEED WITH CARE!  A 
deviation of ±1% per string is 
reasonable. 

Extra Power Optimiser(s) connected in the string 

(not applicable to smart modules). 

Check if an extra Power Optimiser is connected 

in the string. If not – proceed to next solution.

A module is connected directly to the string, 

without a Power Optimiser (not applicable to 

smart modules). 

Verify that only Power Optimisers are connected 

in the string and that no module outputs are 

connected without a Power Optimiser.  If the 

problem persists, proceed to the next step.
Power Optimiser(s) malfunction.

 1.  Disconnect the wires connecting the Power 

Optimisers in the string.

 2.  Measure the output voltage of each Power 

Optimiser to locate the Power Optimiser that 

does not output 1V safety Voltage. If a 

malfunctioning Power Optimisers located, 

check its connections, polarity, module, and 

voltage.

 3.  Contact SolarEdge Support. Do not continue 

before finding the problem and replacing the 

malfunctioning Power Optimiser. If a 

malfunction cannot be bypassed or resolved, 

skip the malfunctioning Power Optimiser, 

thus connecting a shorter string. 

Single Phase Energy Hub Inverter MAN-01-00812-1.1

60

   Power Optimiser Troubleshooting

Содержание Energy Bank

Страница 1: ...Installation Guide Single Phase Energy Hub Inverter with Prism Technology For Australia Version 1 1...

Страница 2: ...y time and without notice You may refer to the SolarEdge web site www solaredge com for the most updated version All company and brand products and service names are trademarks or registered trademark...

Страница 3: ...es cause harmful interference to radio or television reception which can be determined by turning the equipment off and on you are encouraged to try to correct the interference by one or more of the f...

Страница 4: ...y Version 1 1 August 2021 Added support of SolarEdge Energy Bank and LG RESU Prime batteries Version 1 0 January 2021 First release of this guide Revision History 3 Single Phase Energy Hub Inverter MA...

Страница 5: ...ackage Contents 21 Identifying the Inverter 21 Inverter Interfaces 21 Mounting the Inverter 25 Selecting a Residual Current Device RCD 28 Chapter 4 Installing the Battery Optional 30 Chapter 5 Connect...

Страница 6: ...e Inverter Cover 51 Removing the Connection Unit Cover if applicable 51 Creating an Ethernet LAN Connection 52 Verifying the Connection 54 Appendix A Errors and Troubleshooting 55 Identifying Errors 5...

Страница 7: ...met CAUTION Denotes a hazard It calls attention to a procedure that if not correctly performed or adhered to could result in damage or destruction of the product Do not proceed beyond a caution sign...

Страница 8: ...on the product WARNING Opening the inverter and repairing or testing under power must be performed only by qualified service personnel familiar with this inverter WARNING Do not touch the PV panels o...

Страница 9: ...to the inverter due to incorrect interlock installation or use of an interlock that is incompatible with the SolarEdge system will render the SolarEdge warranty invalid For more information on connect...

Страница 10: ...g conditions as described in the technical specifications supplied with the unit NOTE The batteries must be certified according to local regulations and supported by the SolarEdge inverter firmware NO...

Страница 11: ...components and includes a DC Safety Switch The Energy Meter is used by the inverter for export import and consumption readings and for Smart Energy Management applications such as export limitation t...

Страница 12: ...and Smart Energy Management The Backup Interface must be installed to allow the operation of the batteries and inverter during backup 100A microgrid interconnection device disconnects the house loads...

Страница 13: ...ad screwdrivers set Non contact voltage detector Cordless drill with a torque clutch or screwdriver and bits suitable for the surface on which the inverter and optimisers will be installed Use of an i...

Страница 14: ...ssary shocks If the original package is no longer available use a similar box that can withstand the weight of the inverter refer to the inverter weight in the specification datasheet provided with th...

Страница 15: ...ovided with the Power Optimiser CAUTION Cutting the Power Optimiser input or output cable connector is prohibited and will void the warranty CAUTION All PV modules must be connected to a Power Optimis...

Страница 16: ...manufacturer should explicitly verify compatibility with the Power Optimiser connectors and the Inverter DC input connectors A third party test report by one of the listed external labs TUV VDE Bureau...

Страница 17: ...ower Optimisers or between a Power Optimiser and the inverter Extension cables can be installed between Power Optimisers only from row to row around obstacles or pathways within a row and from the end...

Страница 18: ...ng as long as the minimum number of unshaded Power Optimisers connected in a string of modules is met If under typical conditions fewer than the minimum Power Optimisers are connected to unshaded modu...

Страница 19: ...e Power Optimiser or through the mounting holes 3 Attach each Power Optimiser to the rack using M6 or M8 stainless steel bolts nuts and washers or other mounting hardware Apply torque of 9 10 N m 4 Ve...

Страница 20: ...he string s first power optimiser to the Plus output connector of the string s second power optimizer When connecting S Series Power Optimisers be sure to connect the short Minus output connector of o...

Страница 21: ...meanings from those in traditional systems For more information about the SolarEdge system s string voltage and current refer to the VOC and ISC in SolarEdge Systems Technical Note available on the So...

Страница 22: ...astening the inverter to the mounting bracket One 9V battery Identifying the Inverter Refer to the sticker on the inverter that specifies its Serial Number and its Electrical Ratings Provide the seria...

Страница 23: ...ault files se combiner box installation guide aus pdf CT gland for connection of external CTs DC Safety switch connects and disconnects the DC power to the system Two communication glands for connecti...

Страница 24: ...ds then released Starts pairing Pairing is indicated by all 3 LEDs blinking simultaneously LEDs LEDs three LEDs indicate by color and state on off blinking 1 flickering 2 alternating 3 different syste...

Страница 25: ...th the monitoring platform is established Pairing Blinking Blinking Blinking Wake up Grid Monitoring OFF Blinking Blinking System Producing OFF ON S_OK ON No S_OK OFF Night mode no production OFF Flic...

Страница 26: ...y LED color and ON OFF P switch position Indication ON OFF P Switch Position LED Color Comment Red Green Blue Percentage of AC Production 0 ON 1 OFF OFF OFF This indicates power production as percenta...

Страница 27: ...cial brackets purchased separately from SolarEdge and SS304 stainless screws are required 1 Determine the inverter mounting location on a wall stud framing or pole It is recommended to mount the inver...

Страница 28: ...et a Lift the inverter from the sides or hold it at the top and bottom of the inverter to lift the unit into place b Lower the inverter onto the U shaped indentations as shown below Let the inverter l...

Страница 29: ...for the RCD as required for certification DIN VDE 0126 1 1 The default value for electrocution protection is 30 mA and for slow rising current is 300 mA If an external RCD is required by local regulat...

Страница 30: ...ip current of the external RCD The internal RCD will trip if the current is higher than the allowed current but because the internal inverter RCD automatically resets when the residual currents are lo...

Страница 31: ...instructions In addition follow these guidelines Make sure the battery s circuit breaker switch is OFF Measure the necessary length between the and the battery for all cables Mark polarity on DC cabl...

Страница 32: ...e sure not to damage internal components SolarEdge will not be held responsible for any components damaged as a result of incautious cover removal 3 Install a conduit of the required diameter To insta...

Страница 33: ...n panel 2 Strip 2 5 60 mm of the external cable insulation and strip 0 6 15 mm of the internal wire insulation Figure 11 Insulation Stripping AC Cable 3 Pass the AC cable through the conduit 4 Connect...

Страница 34: ...because the inverter has no transformer Grounding earth ground of module frames and mounting equipment of the PV array modules is acceptable NOTE SolarEdge s fixed input voltage architecture enables t...

Страница 35: ...r make sure the battery is powered off SolarEdge Energy Bank 1 Toggle off the battery ON OFF P switch 2 Turn off the battery circuit breaker LG Chem Prime Battery Turn off the circuit breaker Use the...

Страница 36: ...s of the DC cables to the battery input terminals in the combiner box 3 Take the second pair of DC cables and connect them to the inverter output terminals in the combiner box 4 Connect the other ends...

Страница 37: ...terface as explained in the installation manual that comes with the Backup interface 2 Open Communication Gland 1 at the bottom of the Connection Unit 3 Feed the other end of the communication cable t...

Страница 38: ...CT connection 4 Close the CT gland to a torque of 5 5 N m Installing the 9V Battery A 9V battery is supplied with the inverter to enable the inverter to start production in case of a power outage To i...

Страница 39: ...the AC output from the additional inverters must be connected to the Backup Interface Use a circuit breaker CB UPG xx 01 purchasable from SolarEdge For more information refer to the Backup Interface...

Страница 40: ...onnect one end of the communication cable to the RS485 1 connector on the communication board For more information refer to the HD Wave inverter Installation Guide 2 Pass the other end of the communic...

Страница 41: ...connect For communication options refer to Setting Up Communication with the Monitoring Platform on page 49 Before arriving at the site download SolarEdge SetApp application to your mobile device fro...

Страница 42: ...settings Menus may vary in your application depending on your system type To access the Commissioning screen Do one of the following During first time installation Upon activation completion in the S...

Страница 43: ...er starts converting power after the initial connection to the AC the inverter enters Wake up mode until its working voltage is reached This mode is indicated by the flickering green inverter LED When...

Страница 44: ...hat the green inverter LED is steadily lit Your SolarEdge power harvesting system is now operational Configuring Communication with Other Devices If the above devices have not been auto detected durin...

Страница 45: ...N 2 Switch the inverter ON OFF P switch to ON 3 In SetApp select Commissioning Maintenance Diagnostics Self Test Battery Self Test Run Test 4 Wait for all tests to complete and check the results in th...

Страница 46: ...ng for time of use arbitrage applications The Backup application can be used whether or not PV modules are installed at the site The backup function is disabled by default and can be enabled for on gr...

Страница 47: ...comparing their performance to that of other components of the same type Pinpoint the location of alerted components using the physical layout The monitoring platform enables accessing site informatio...

Страница 48: ...imiser selection per site size and enables report generation You can create a project in Designer and export the site design with the string layout to the monitoring platform For more information refe...

Страница 49: ...com solaredge web p home createSites If you have not yet signed up go to https monitoring solaredge com solaredge web p createSelfNewInstaller 2 Fill out all required information in the screen which i...

Страница 50: ...r and the switch of the Connection Unit if applicable is turned OFF and the AC is turned OFF When configuring the communication parameters while the inverter cover is removed make sure that the ON OFF...

Страница 51: ...r installation guide pdf Cellular This wireless communication option enables using a cellular connection to connect one or several devices depending on the data plan used to the monitoring platform Th...

Страница 52: ...nal components SolarEdge will not be held responsible for any components damaged as a result of incautious cover removal Removing the Connection Unit Cover if applicable 1 Switch off the AC circuit br...

Страница 53: ...escribed above 2 Open Communication Gland 1 CAUTION The gland includes a rubber waterproof fitting which should be used to ensure proper sealing 3 Remove the plastic seal from one of the large opening...

Страница 54: ...ctor see Figure 21 d Use a crimping tool to crimp the connector e Connect the Ethernet connector to the RJ45 port on the communication board see Figure 20 8 For the switch router side use a pre crimpe...

Страница 55: ...nd outgoing data 11 Verify the connection as described in Verifying the Connection on page 54 Verifying the Connection After connecting and configuring a communication option perform the following ste...

Страница 56: ...the methods described below To identify the error type using the inverter LEDs 1 Move the ON OFF P switch to P position for 2 seconds and release it 2 Observe the LED lights and use the following tab...

Страница 57: ...backed up loads during a power outage The loads are not backed up Check the following The inverter is producing power The Backup function is enabled as explained in Enabling StorEdge Applications on p...

Страница 58: ...ation Consult your network IT Configure Static IP or set to DHCP Gateway not responding Ping to router failed Check the physical connection to the switch router Check that the link LED at the router s...

Страница 59: ...ly configured 4 Use a method independent of the SolarEdge device to check whether the network and modem are operating properly For example connect a laptop to the Ethernet router and connect to the In...

Страница 60: ...string Connect all Power Optimisers Panel s not connected properly to Power Optimiser inputs not applicable to smart modules Connect the modules to the Power Optimiser inputs String reverse polarity C...

Страница 61: ...ected in the string and that no module outputs are connected without a Power Optimiser If the problem persists proceed to the next step Power Optimiser s malfunction 1 Disconnect the wires connecting...

Страница 62: ...A2 2005 DIN EN 60947 3 VDE 0660 107 2006 03 IEC 60364 7 712 2002 05 DIN VDE 0100 712 2006 06 In compliance with these standards follow the instructions below to disconnect DC power 1 1 Move the inver...

Страница 63: ...e 184 264 5 Vac AC Frequency Range nominal 50 60 5 Hz Maximum Continuous Output Current 14 19 23 28 38 46 A Total Harmonic Distortion THD 3 Power Factor 1 adjustable 0 9 to 0 9 Utility Monitoring Isla...

Страница 64: ...6500 20000 W Max Input Current 5 8 5 11 14 16 5 22 5 27 5 Adc Maximum Inverter efficiency 99 2 European Weighted Efficiency 98 8 99 Reverse Polarity Protection Yes Battery Storage Supported Battery Ty...

Страница 65: ...t for local connection STANDARD COMPLIANCE Safety IEC 62103 EN50178 IEC 62109 AS NZS3100 Grid Connection Standards AS NZS4777 Emissions IEC 61000 6 2 IEC 61000 6 3 IEC 61000 3 11 IEC 61000 3 12 INSTAL...

Страница 66: ...tallations with multiple inverters For a single backup inverter operation rated current in backup is 90 of the stated value 5 A higher current source may be used the inverter will limit its input curr...

Страница 67: ...he error indicated on the SetApp mobile application on the monitoring platform or by the LEDs if there is such an indication System configuration information including the type and number of modules c...

Страница 68: ......

Отзывы: