December 2020
|
Solar Stik
®
, Inc.
36
|
SYSTEM SETUP AND OPERATION GUIDE FOR THE SOLAR STIK USAF G-BOSS MEDIUM AND HEAVY HYBRID POWER SYSTEM
PRELIMINARY DRAFT
e Connect PRO-Verter 5000 to Data Distribution Unit (Optional)
Use an Ethernet cable to connect the PRO-Verter to the Data Distribution Unit (DDU). The TECH
PORT provides access to System-level operation data. The PRO-Verter must be equipped with a
Remote Monitoring Kit for data to be retrievable from the TECH PORT.
Figure 23. PRO-Verter to DDU connection
PRO-Verter front view
DDU