December 2020
|
Solar Stik
®
, Inc.
50
|
SYSTEM SETUP AND OPERATION GUIDE FOR THE SOLAR STIK USAF G-BOSS MEDIUM AND HEAVY HYBRID POWER SYSTEM
PRELIMINARY DRAFT
AGS Faults
Fault Gen Run
Fault MaxRn
Fault VDC
BMK Faults
Factory Fault
Power-up Fault
Unknown Fault ##
Inverter/Charger
Faults
AC Overload
Breaker Tripped
Dead Batt Charge
FET Overload
High Battery
High Volts AC
Low Battery
Overcurrent
Overtemp
Stuck Relay
Tfmr Overtemp
Unknown Fault ##
PRO-Verter Internal
Fault Messages
Internal Bridge
Internal Charger
Internal NTC
Internal Relay
Quick Links to Statuses, Faults, and Resolutions
This guide is interactive if used on a computer or handheld device. Each of the faults in the lists
below is touch-linked to an explanation of the fault and a solution to resolve the fault.
BMK Statuses
AGS Statuses
AC In
Gen Cooldown
Gen Warm-up
Manual Run
No Comm
Off
Quiet Time
Ready
Start VDC
Quick Links to PRO-Verter Status Messages
Charger Mode Status Messages
Inverter Mode Status Messages
Secondary Scrolling Status Messages
Quick Links to Problems: Solutions and Explanations
Charger Problems: Solutions and Explanations
Inverter Problems: Solutions and Explanations
Quick Links to Other Troubleshooting Guides
PRO-Verter LCD Screen Troubleshooting Table
PRO-Verter Troubleshooting