AGS Operational Statuses (Meter 04)
AC In
The inverter/charger is connected to another source, such as a grid or an alternate generator, and
is not controlled by the AGS. When AC In displays, the AGS is prevented or locked out from all
autostarting conditions, except for when the generator needs to exercise—if enabled.
Gen Cooldown
The autostop setting has been met in one of the generator autostart/autostop menus and the
generator has been disconnected from the PRO-Verter. However, the generator still runs until the
cooldown time is met (as per the SETUP: 04J Gen Cooldown Time setting).
Gen Warm-up
The AGS is attempting to start the generator and a time period has been set from the SETUP: 04I
Gen Warm-up Time menu. Once the AGS status indicates “Warm-up”, the PRO-Verter’s AC input
ignores any incoming AC power. This prevents the PRO-Verter from loading the generator during
warm-up. Once the AGS has determined that the generator is running, the warm-up time setting
must be met before the generator can connect to the PRO-Verter.
Manual Run
Generator started manually from a start/stop switch directly connected to the generator, or from the
CTRL: 03 Gen Control menu.
No Comm
The AGS is not communicating with the inverter or the LCD User Interface.
Off
The CTRL: 03 Gen Control menu is set to OFF. This setting will not allow the AGS to autostart the
generator.
Quiet Time
The AGS has entered Quiet Time per the SETUP: 04G Quiet Time setting. This setting is generally
not programmed in Solar Stik PRO-Verters.
Note:
The generator will not autostart during Quiet Time.
Ready
The CTRL: 03 Gen Control menu is set to AUTO, and the AGS is ready to autostart the generator
based on the active autostart settings under the SETUP: 04 AGS Setup menus.