137
August 2020
|
Solar Stik
®
Inc.
PSS-G/RAID Alternative Energy System Deployment Guide
MEP-802A
L1
L2
L3
N
120V
1PH
120/
240V
1PH
120/
208V
3PH
GND
W110 pigtail
W210
cable
30A / 240VAC/1PH
LOAD TERMINAL
BOARD
Configuring the MEP-802A to Support 120 VAC and 240
VAC Loads Simultaneously
The two meters above the dial report the output
amperage and voltage. These meters will report ONLY
ONE of the two outputs (120 or 240 VAC as shown in
the configuration above) at a time. The output selection
switch shown in the figure to the right, is set so that it
will report the 240 VAC output.
Use the output selection switch to choose the setting
that is appropriate for reporting the desired output.
Begin with the outer ring “PHASE”, then “VOLTS”, then
“AMPS” (the most interior ring) choosing the setting
the reflects the wiring configuration of interest. A white
arrowhead indicates the direction that the switch is
pointing. Moving the switch to point at approximately
“5 o’clock” will cause the two meters to report the
output from the 120 VAC line in the configuration
above. Note: The selection switch DOES NOT change
the generator output in any way.
Ammeter
Voltmeter
output
selection
switch
L5-50R
L14-30P
connector
type
connector
type
L14-30R
L14-30P
connector
type
connector
type
PRO-Verter
7000-120
PRO-Verter
5000-240
W16
pigtail
W116
cable
PSS-G
Tower
Conex
50A /120VAC/1PH
Figure 77. TQG 120 and 240 VAC output settings
Figure 78. TQG voltage and current gauges
Monitoring Output Voltage and Current