PSS-G/RAID Alternative Energy System Deployment Guide
August 2020
|
Solar Stik
®
Inc.
54
|
13 Install and Connect Generator Power Cable to PRO-Verter 7000
PRO-Verter 7000 AGS
5kW MEP-802A TQG
120 VAC 50 A input
Voltage/phase setting for
the MEP-802A generator
in the PSS-G/RAID AES
configuration
MEP-802A 120VAC
power-out cable
Hubbell 120VAC/50A AC power-in port
Wiring configuration for
the 120 VAC power-out
cable of the MEP-802A
a. Position the voltage/phase selector to 120V/1PH.
b. Connect the bare ends of the generator power cable to the MEP-802A (green to GND,
black to L3, and white to N) using the wrench affixed to the interior of the generator.
c. Tighten the protective cover around the cable where the cable exits from the generator.
There may be cables already attached to the MEP-802A TQG. These can remain attached as
long as the external ends are capped and protected.
d. Connect the power cable to the
120VAC/50A Hubbell port on the left side
of the PRO-Verter 7000 AGS.
Legend
AC supply power cord
Direction of flow energy or comm
Figure 50. PRO-Verter 7000 AGS to MEP-802A TQG AC power connection