Legend
AC load circuit
AC supply power cord
*W16
*W110
5 kW MEP-802A TQG
PSS-G/RAID Tower
*W116 Cable
*W210 Cable
Conex
*Cables not supplied with AES Kit
* The following power cables are native to the PSS-G and RAID Systems:
•
W16 - 120 V Pigtail installed on TQG for Tower operation
•
W110 - 240 V Pigtail installed on TQG for Conex operation
•
W116 - Primary power cord between W16 and J1 on Tower
•
W210 - Primary power cord between W110 and junction box on Conex
These power cables are not included as part of the AES package and can be
found with the existing PSS-G and RAID systems
.