SYSTEM SETUP AND OPERATION GUDIE FOR THE 1 kW HYBRID POWER SYSTEM (HPS)
PRELIMINARY DRAFT
2 System Connection Diagram and Parts List
Figure 14. 1 kW HPS diagram connection map
Power
Generation
Power Management
PV Array(s)
Energy
Storage
24VDC Li Expander Paks
24VDC PRO-Verter S 2000-120
Load
Man Portable
Generato
r (MPG)
ALL Solar Stik equipment is designed for operation in adverse conditions, however, certain rules
apply:
1
If operating in wet environments, use common-sense placement to avoid water intrusion by either
flooding or precipitation.
2
If operating in dusty environments, ensure good airflow by keeping air filters clean and placing
unit in a location that minimizes exposure to particulates.
Direct ground placement of any power management or energy storage component is generally not
recommended, but possible if no other option is available. If it is necessary, preventative measures
for water and dust should be taken. Consult the Maintenance Instructions section of this manual for
additional details and component-specific
preventive maintenance checks and service (PMCS)
.
1 Minimize Potential for Water and Dust Intrusion
OPERATOR INSTRUCTIONS
Item #
Nomenclature
QTY
21-0202316
24VDC Li EXPANDER PAK 1300
2
13-1000267
24VDC INTERCONNECT CABLE, 5’ LINEAR
2
13-1000032
24VDC INTERCONNECT CABLE, 5’
1
13-1000160
24VDC INTERCONNECT STRIP 7
1
20-0104025
24VDC PRO-VERTER S 2000-120 EAG1
1
01-1000100
NOVATIO DEFENDER 1kW with E-START MOD
1
13-1000288
GENERATOR COMMUNICATIONS CABLE, 1kW and 2kW, 10'
1
13-1000277
AC POWER CABLE, 10', 5-15P to 5-15R
1
19-1000012
SOLAR VENTURE 300W Kit (Includes Cable and Case)
1
24VDC
Inter-Connect
Strip 7