|
39
June 2020
|
Solar Stik
®
, Inc.
SYSTEM SETUP AND OPERATION GUDIE FOR THE 1 kW HYBRID POWER SYSTEM (HPS)
PRELIMINARY DRAFT
f Connect PRO-Verter to 120 VAC Loads
Connect 120 VAC loads to the PRO-Verter AC output on the left side of the PRO-Verter. Connect
loads of no more than 20 A. Turn off load power switches to prevent power draw during System
setup.
Figure 22. PRO-Verter AC power output port