June 2020
|
Solar Stik
®
, Inc.
68
|
SYSTEM SETUP AND OPERATION GUDIE FOR THE 1 kW HYBRID POWER SYSTEM (HPS)
PRELIMINARY DRAFT
Preventive Maintenance Checks and Services (PMCS)
Failure to follow these instructions may result in permanent equipment failure and/or
personal injury
Required Tools
Solar Stik PRO-Verter or LiFePO4 battery maintenance charger.
In-storage PMCS for 24VDC Li Expander Pak 1300
Table 13. In-storage Preventive Maintenance Checks and Services
1
Monthly (M)—every month
2
Quarterly (Q)— every three months
3
Semiannually (S) – every 6 months
Item #
Item to be
Inspected
Interval*
at
91-140 ºF
(33-60 ºC)
Storage
Temp
Interval* at
77-90 ºF
(< 25-32 ºC)
Storage
Temp
Procedures
Non-mission
Capable
1
Visual
inspection
of 24VDC
Li Expander
Pak 1300
M
1
Q
2
1. Inspect case for visible
damage and missing
items.
2. Clean excessive dust or
dirt accumulation from
the exterior and ports.
3. Close all unused port
covers.
~If the case is
broken or split
or if the port
is damaged,
contact Solar Stik
Technical Support.
2
In-storage
maintenance
charging
Q
S
3
Charge Li Expander Paks
for 24 hours using a PRO-
Verter. If any other charging
device is used, it must be
rated for the Expander Pak
storage capacity, voltage,
and current limit.
If an Li Expander
Pak has does not
hold a charge
after 48 hours
of charging,
contact Solar Stik
Technical Support.