SYSTEM SETUP AND OPERATION GUDIE FOR THE 1 kW HYBRID POWER SYSTEM (HPS)
PRELIMINARY DRAFT
List of Parameter Groups 1 to 7
Parameter
Group Name
Description
Group 1
CHARGE CURVE
Parameters for battery charging/battery protection.
Group 2
INPUT SETTING
Parameters for grid/generator input current level, frequency range.
Group 3
INPUT LOW LIMIT
Parameters for grid/generator input low voltage level.
Group 4
INPUT HIGH LIMIT
Parameters for grid/generator input high voltage level.
Group 5
OTHER FUNCTION
Power Saving/Alarm/Remote Switch/Multi-function Relay/etc.
Group 6
TIME SETTING
Local time clock setting.
Group 7
STOP SD CARD
Shown only when SD card is inserted.
To stop SD card and to remove the SD card.
Parameter Groups: PRO-Verter Programmable Settings
Table 3. Programmable Parameter Groups: Descriptions
“Parameter Groups” are the top-level categories of PRO-Verter programming.