SOFAR 7K~10.5KTLM-G3
User manual
Copyright © Shenzhen SOFAR SOLAR Co., Ltd
- 2 -
the property destruction and personal injury because of any incorrect use.
Installation requirements
Please install inverter according to the following section. Fix the inverter on an
appropriate object with enough load bearing capacity (such as walls, PV racks
etc.), and ensure that inverter is vertical placed. Choose a place suitable for
installing electrical devices and assure there is enough fire exit space, convenient
for maintenance. Maintain proper ventilation to ensure enough air cycle to cool
the inverter.
Transport requirements
If you find packing problems that may cause the damage of the inverter, or find
any visible damage, please immediately notice the responsible transportation
company. You can ask solar equipment installation contractor or Shenzhen
SOFARSOLAR Co.Ltd for help if necessary.
Transport of the equipment, especially by road, must be carried out with by
suitable ways and means for protecting the components (in particular, the
electronic components) from violent shocks, humidity, vibration, etc.