SOFAR 7K~10.5KTLM-G3
User manual
Copyright © Shenzhen SOFAR SOLAR Co., Ltd
- 13 -
Therefore, check the outer packing materials before installing the inverter.
Check the outer packing materials for damage, such as holes and cracks. If any
damage is found, do not unpack the SOFAR 7K~10.5KTLM-G3 and contact the
dealer as soon as possible. You are advised to remove the packing materials
within 24 hours before installing the SOFAR 7K~10.5KTLM-G3 inverter.
Checking Deliverables
After unpacking the inverter, check whether deliverables are intact and complete.
If any damage is found or any component is missing, contact the dealer.
Table3-1 Shows the components and mechanical parts that should be delivered.
NO.
Picture
Description
Quantity
1
7K~10.5KTLM-G3
1pcs
2
Rear panel
1pcs
3
PV+ input terminal
3pcs
4
PV- input terminal
3pcs
5
Metal terminals secured to
PV+ input power cables
3pcs