Smiths Aerospace
Electronic Systems – Malvern
DOC NO.0134ED
MAINTENANCE MANUAL SUPPLEMENT
BOEING B737-100/200/300/400/500
28-41-04
Measure resistance from Hi-Z to Hi-Z
Shield at tank wall.
C
Como
not within
AMM limits
C
comp
within AMM limits
Drain Fuel Tank.
Measure value of compensator at tank
wall per AMM 28-41-21.
Replace TSU
(AMM 28-41-04/401)
Repair/Replace tank harness
(AMM 28-41-44/401)
1
Repair/Replace fault to Hi-Z shield in
tank harness (AMM 28-41-44/401)
< 50 megohm
> 50 megohm
Remove TSU harness from tank
wall bussing connector.
Repair fault to ground in
tank harness
(WDM 28-41-01)
>50 megohm
<50 megohm
Measure resistance from Hi-Z to GND
at tank wall.
Operational Test
(AMM 28-41-04/501)
Err 10: Hi-Z Line Open or Short (continued)
Figure 108 (Sheet 2)
Page 122
April 19/02
Airplanes with Smiths 2307 Model Fuel Quantity
Indicators with TSU
EFFECTIVITY