- 42 -
No.EX
※※
-OMU1006-B
Table C-4 Commissioning and Parameterisation
Checklist for commissioning and parameterization of the module
Device type/equipment identification
Version: HW/FW
Date
Creator
Test engineer
Remark
No.
Requirement (mandatory)
Yes
Remark
1
Was commissioning completed according to the specifications
(specifications from the planning phase or according to the user
manual)?
2
During commissioning, is it ensured that any person intentionally
starting hazardous movements can only do so with a direct view of
the danger zone?
3
Are all parameters parameterized for the outputs and is the
F_WD_Time set correctly?
4
If PWR(V) diagnostics parameter is disable is a suitable
countermeasure used?
No.
Requirement (optional)
Yes
No
Remark
5
Have safety distances that must be observed been calculated
according to the response and delay times implemented/?
Date
Signature(creator)
Date
Signature (test engineer)