14 Procedure for Receiving a Replacement Device
SMA Solar Technology AG
Operating manual
SHP-US-20-BE-en-10
87
• Unscrew the screws of the enclosure lid (TX25)
and remove it.
12x
• Position the enclosure lid and first tighten the
upper-left and lower-right screws, and then the
remaining screws crosswise (TX25, torque:
6 Nm ± 0.3 Nm (53 in-lb ± 2.65 in-lb)).
2
1
12x
10x
7. Commission the replacement device (see Section 8.2, page 37).
8. Establish a connection to the user interface (see Section 9.1, page 46).
9. On the
Configure inverter
page, select the
Adopt configuration from file
configuration
option and load the saved configuration file of the defective product (see Section 8.3,
page 39).
10. If the defective inverter had been registered by a communication product, replace it with the
new product in the communication product.
11. Pack the defective product in the packaging of the replacement device.
12. Fasten the packaging to the pallet on which the replacement device was supplied using the
reusable lashing straps.
13. Arrange for pick-up with SMA Solar Technology AG.
Содержание SHP 125-US-20
Страница 1: ...SMA SUNNY HIGHPOWER SHP US 20 BE en 10 Version 1 0 ENGLISH Operating manual SUNNY HIGHPOWER PEAK3 US...
Страница 95: ......
Страница 96: ...www SMA Solar com...