
5.
Press
or
to adjust the
sensitivity level.
e.g. sensitivity -80 dB
Press
to store the level.
6.
Enter the Dwell Time which is the period in which the
receiver will "listen" for a signal on each frequency.
e.g. 2.5 seconds.
Press
to store the Dwell Time.
7.
Enter the Hold Time which is the period in which the
receiver will stay on a frequency if the Trigger Source
has detected a signal.
e.g. 20 seconds.
Press
to store the Hold Time.
Now the channels that you wish to scan must be stored in the Scan Table.
8.
Enter the first Channel Number to be scanned.
e.g. ITU ch. 403
Press
to store the channel.
CHANNEL SCANNING, SET UP
OPERATION
TRP 9250 TECHNICAL MANUAL
2-33
Содержание TRP 9250
Страница 1: ...TRP 9250 250 Watt Radio Transceiver for MF HF SKANTI...
Страница 5: ...ff qom VORM qb ekf i j kr i...
Страница 7: ...INTRODUCTION 1 2 TRP 9250 TECHNICAL MANUAL...
Страница 17: ...OPERATION 2 OPERATION Table of Contents 2 2 TRP 9250 TECHNICAL MANUAL...
Страница 73: ...INSTALLATION 3 INSTALLATION Table of contents 3 2 TRP 9250 TECHNICAL MANUAL...
Страница 99: ...INSTALLATION 3 28 TRP 9250 TECHNICAL MANUAL...
Страница 139: ...TECHNICAL DESCRIPTION 4 TECHNICAL DESCRIPTION Table of Contents 4 2 TRP 9250 TECHNICAL MANUAL...
Страница 147: ......
Страница 149: ......
Страница 150: ......
Страница 152: ...SERVICE 5 SERVICE Table of contents 5 2 TRP 9250 TECHNICAL MANUAL...
Страница 166: ...SERVICE POWER PROTECTION 5 16 TRP 9250 TECHNICAL MANUAL...
Страница 174: ...SERVICE SERVICE RELATED PROG KEY OPERATIONS 5 24 TRP 9250 TECHNICAL MANUAL...
Страница 194: ...DSC 9000 FRONT PANEL DSC OPERATION DSC 9000 FRONT PANEL 6 2 TRP 9250 TECHNICAL MANUAL...
Страница 226: ...SENDING A DIRECT DIAL CALL INFO DSC OPERATION SENDING A DIRECT DIAL CALL INFO 6 34 TRP 9250 TECHNICAL MANUAL...
Страница 264: ...DSC OPERATION 6 72 TRP 9250 TECHNICAL MANUAL...
Страница 266: ...DSC INSTALLATION 7 DSC INSTALLATION Table of Contents 7 2 TRP 9250 TECHNICAL MANUAL...
Страница 268: ...DCU 9000 WITH MOUNTING BRACKET Fig 5 DSC INSTALLATION DCU 9000 WITH MOUNTING BRACKET 7 4 TRP 9250 TECHNICAL MANUAL...
Страница 279: ...MOUNTING BRACKET TERMINAL BOARD Fig 22 MOUNTING BRACKET TERMINAL BOARD DSC INSTALLATION TRP 9250 TECHNICAL MANUAL 7 15...
Страница 288: ...DSC INSTALLATION 7 24 TRP 9250 TECHNICAL MANUAL...