
Enter the time.
Press
Press
to return to the
STATUS display.
If more than 12 hours have elapsed since the last updating, the time will be deleted.
PROGRAMMING
Position
55 ˚ 59 ’ N 133˚ 20’ W at
(1229)
UTC
--- Enter the time of the position ---
PROGRAMMING
Position
55 ˚ 59 ’ N 133˚ 20’ W at 1229 UTC
>END<
PROGRAMMING: POSITION
DSC OPERATION
TRP 9250 TECHNICAL MANUAL
6-57
Содержание TRP 9250
Страница 1: ...TRP 9250 250 Watt Radio Transceiver for MF HF SKANTI...
Страница 5: ...ff qom VORM qb ekf i j kr i...
Страница 7: ...INTRODUCTION 1 2 TRP 9250 TECHNICAL MANUAL...
Страница 17: ...OPERATION 2 OPERATION Table of Contents 2 2 TRP 9250 TECHNICAL MANUAL...
Страница 73: ...INSTALLATION 3 INSTALLATION Table of contents 3 2 TRP 9250 TECHNICAL MANUAL...
Страница 99: ...INSTALLATION 3 28 TRP 9250 TECHNICAL MANUAL...
Страница 139: ...TECHNICAL DESCRIPTION 4 TECHNICAL DESCRIPTION Table of Contents 4 2 TRP 9250 TECHNICAL MANUAL...
Страница 147: ......
Страница 149: ......
Страница 150: ......
Страница 152: ...SERVICE 5 SERVICE Table of contents 5 2 TRP 9250 TECHNICAL MANUAL...
Страница 166: ...SERVICE POWER PROTECTION 5 16 TRP 9250 TECHNICAL MANUAL...
Страница 174: ...SERVICE SERVICE RELATED PROG KEY OPERATIONS 5 24 TRP 9250 TECHNICAL MANUAL...
Страница 194: ...DSC 9000 FRONT PANEL DSC OPERATION DSC 9000 FRONT PANEL 6 2 TRP 9250 TECHNICAL MANUAL...
Страница 226: ...SENDING A DIRECT DIAL CALL INFO DSC OPERATION SENDING A DIRECT DIAL CALL INFO 6 34 TRP 9250 TECHNICAL MANUAL...
Страница 264: ...DSC OPERATION 6 72 TRP 9250 TECHNICAL MANUAL...
Страница 266: ...DSC INSTALLATION 7 DSC INSTALLATION Table of Contents 7 2 TRP 9250 TECHNICAL MANUAL...
Страница 268: ...DCU 9000 WITH MOUNTING BRACKET Fig 5 DSC INSTALLATION DCU 9000 WITH MOUNTING BRACKET 7 4 TRP 9250 TECHNICAL MANUAL...
Страница 279: ...MOUNTING BRACKET TERMINAL BOARD Fig 22 MOUNTING BRACKET TERMINAL BOARD DSC INSTALLATION TRP 9250 TECHNICAL MANUAL 7 15...
Страница 288: ...DSC INSTALLATION 7 24 TRP 9250 TECHNICAL MANUAL...