Simrad ME70
Power on/off procedures
These procedures explain how to switch the ME70 system on and off.
Topics
•
on page 18
•
on page 18
•
on page 19
Powering up the ME70
Purpose
This procedure explains how to power up the Simrad ME70 system.
Note
If the ambient temperature in the sonar room is low, the system may need time to warm
up. If this is the case, leave the system idle for approximately 30 minutes, then do the
Restart procedure.
Prerequisites
a
The ME70 Transceiver Unit is connected to the ship’s mains and set up for
operational use.
b
All the circuit breakers in the Transceiver Unit are engaged.
c
The air conditioning system in the sonar room is operational.
Procedure
1
Power up the colour display.
If required, refer to the instructions provided by the display manufacturer.
2
Power up the Processor Unit (computer).
Wait for the operating system to start up.
3
Double-click the ME70 icon on the desktop to start the program.
4
Wait while the program starts on the computer.
5
Open the
Setup
menu in the ME70 application, and click the
TRU On/Off
button.
6
Observe that the
TRU StartUp
dialog box opens.
7
Click the
Start
button in the
TRU StartUp
dialog box.
8
Allow the transceiver to start, and observe the status reported by the
TRU StartUp
dialog box.
Powering off the ME70
Purpose
This procedure explains how to power off the Simrad ME70.
18
378945/B
Содержание ME70 - REV C
Страница 2: ......
Страница 8: ...Simrad ME70 6 378945 B...
Страница 10: ...Simrad ME70 Record of changes A 21 12 2012 First version of manual 8 378945 B...
Страница 112: ...ISBN 13 2014 Kongsberg Maritime AS...