EN
Product range
17
The illustrations are symbolic and may deviate from the respective product.
Subject to technical modifications and errors.
8.
Electrical connection
8.1. General note on connection
General
Work on the electrical system and the opening of electrical housings may only be carried out when the system is de-energised and only by
authorised specialist personnel. Ensure correct terminal assignment and polarity. Protect the electrical components against overvoltage.
Improper electrical connection may result in danger to life through electric shock.
X
Electrical connection should only be carried out by an electrician approved by the local power supply company
and in accordance with the locally applicable regulations.
X
Disconnect the supply voltage before working.
X
Do not open the housing parts!
8.2. Connection terminals in the energy saving controller
To install, simply push the cable in as far as it will go. To disassemble, press the button and pull out the cable.
Spring terminal
Screw terminal
Multiple assignment is possible
21
Spring terminal
0.5 - 1.5 mm
2
0.5 - 1.0 mm
2
9 mm
9 mm
22
Screw terminal
0.14 - 1.5 mm
2
0.14 - 1.5 mm
2
0.25 - 0.5 mm
2
7 mm
7 mm
7 mm
0.08 - 0.75 mm
2
0.08 - 0.5 mm
2
7 mm
7 mm
Secos
- Simplex Energy Control System
Installation instructions
|
Operating instructions