007-4857-002
1
Chapter 1
1.
System Installation
This chapter describes how to unpack and install your Altix 450 system. Specifically, the
following topics are covered:
•
“System Installation Overview” on page 2
•
“Safety Precautions” on page 3
•
“Installing a Rack” on page 6
•
“Unpacking and Inspecting Modules” on page 22
•
“Installing the IRUs in a Rack” on page 24
•
“NUMAlink Cabling the System IRUs” on page 29
•
“Cabling the System IRUs to a Power Source” on page 31
If you have arranged to have your system installed and set up by SGI professional services
personnel, you can skip this chapter and go on to Chapter 2, “Operation Procedures”.
Содержание SGI Altix 450
Страница 1: ...SGI Altix 450 System User s Guide Document Number 007 4857 002 ...
Страница 4: ......
Страница 14: ......
Страница 16: ......
Страница 125: ...Altix 42U and 20U Rack Features 007 4857 002 103 Figure 5 1 Tall 42U Altix Rack and Front Lock ...
Страница 128: ......
Страница 139: ...Replacing IRU Components 007 4857 002 117 Figure 6 7 Replacing an IRU Fan B A Tighten screw ...
Страница 152: ...130 007 4857 002 6 Maintenance and Upgrade Procedures Figure 6 16 Extracting the Carrier Metal Filler Plate ...
Страница 164: ......
Страница 186: ......