Operating Your System
007-4857-002
39
Powering On With Optional System Console and L1/L2 Controller
To power on and boot your system using the system console, follow these steps:
1.
If not yet done so, connect a system console to the server system as described in
“Connecting the System Console” on page 36.
2.
If the monitors and other peripherals are equipped with voltage select switches, verify that
they are set for the appropriate AC voltage and plug them in. Note that they are normally
plugged into sources outside the rack system.
3.
Turn on the on/off circuit breaker switchs of the PDU as shown in Figure 1-20.
Figure 1-20
PDU Circuit Breakers Example
Power
distribution
unit (PDU)
Power
source
On/off switches
Содержание SGI Altix 450
Страница 1: ...SGI Altix 450 System User s Guide Document Number 007 4857 002 ...
Страница 4: ......
Страница 14: ......
Страница 16: ......
Страница 125: ...Altix 42U and 20U Rack Features 007 4857 002 103 Figure 5 1 Tall 42U Altix Rack and Front Lock ...
Страница 128: ......
Страница 139: ...Replacing IRU Components 007 4857 002 117 Figure 6 7 Replacing an IRU Fan B A Tighten screw ...
Страница 152: ...130 007 4857 002 6 Maintenance and Upgrade Procedures Figure 6 16 Extracting the Carrier Metal Filler Plate ...
Страница 164: ......
Страница 186: ......