14
007-4857-002
1: System Installation
Figure 1-4 shows the lift openings and dimensions of a short rack shipping crate. This figure also
shows where to position the pallet jack.
Figure 1-4
Dimensions of Short Rack Shipping Crate
Inspecting the Shipping Crate
After the system is unloaded from the truck, follow these steps before you unpack it:
1.
Ensure that the crates and cartons arrive unopened.
2.
Inspect the shipping crate for signs of external damage such as dents, holes, crushed corners,
and water marks.
3.
Ensure that the tilt watch has not been tripped.
4.
If the crate is damaged, file a damage claim with the carrier immediately. In addition, notify
your local Customer Support Center (CSC) for any missing, incorrect, or damaged items.
For CSC contact information, see http://www.sgi.com/support/supportcenters.html.
Pallet jack position
48.75
(1238 mm)
42.75
(1068 mm)
29.25
(743 mm)
Side view
End view
Содержание SGI Altix 450
Страница 1: ...SGI Altix 450 System User s Guide Document Number 007 4857 002 ...
Страница 4: ......
Страница 14: ......
Страница 16: ......
Страница 125: ...Altix 42U and 20U Rack Features 007 4857 002 103 Figure 5 1 Tall 42U Altix Rack and Front Lock ...
Страница 128: ......
Страница 139: ...Replacing IRU Components 007 4857 002 117 Figure 6 7 Replacing an IRU Fan B A Tighten screw ...
Страница 152: ...130 007 4857 002 6 Maintenance and Upgrade Procedures Figure 6 16 Extracting the Carrier Metal Filler Plate ...
Страница 164: ......
Страница 186: ......