L2 Operation
007-4857-002
91
Once the L2 is running, you can telnet to the L2, or use an optional SGIconsole.
After the connection to the L2 controller is established, the following prompt appears, indicating
that the L2 is ready to accept commands:
olympic-101-L2>
Common operations are discussed in the subsections that follow.
Viewing System Configuration
You can use the L2’
s config
command to view the current system configuration from an IRU
level:
olympic-101-L2> config
L2 127.0.0.1: - 001 (LOCAL)
L1 127.0.0.1:0:0 - 001c31
L1 127.0.0.1:0:1 - 001c21
L1 127.0.0.1:0:2 - 001c11
L1 127.0.0.1:0:3 - 001c01
L2>
As shown above,
config
produces a list of IRUs and their locations in the system and the system
controller address of each IRU. This is similar to the output from using the
config
command on
the L1 with the addition of the L2 IP address, L1 connection, and L1 index.
The structure of the IRU address is as follows:
a.b.c.d:x:y
where:
a.b.c.d
is the IP address of the L2. (In the example above, the IP address is 127.0.0.1.)
x
connection number is only 0 for Altix 450
y
is the L1 index - the index identifies an IRU by its rack, type, and slot (001c01).
The structure of the IRU location is as follows:
rrrbss.p
where:
rrr
is the rack number.
Содержание SGI Altix 450
Страница 1: ...SGI Altix 450 System User s Guide Document Number 007 4857 002 ...
Страница 4: ......
Страница 14: ......
Страница 16: ......
Страница 125: ...Altix 42U and 20U Rack Features 007 4857 002 103 Figure 5 1 Tall 42U Altix Rack and Front Lock ...
Страница 128: ......
Страница 139: ...Replacing IRU Components 007 4857 002 117 Figure 6 7 Replacing an IRU Fan B A Tighten screw ...
Страница 152: ...130 007 4857 002 6 Maintenance and Upgrade Procedures Figure 6 16 Extracting the Carrier Metal Filler Plate ...
Страница 164: ......
Страница 186: ......