![SILENT KNIGHT INTELLIKNIGHT 5820XL Скачать руководство пользователя страница 59](http://html1.mh-extra.com/html/silent-knight/intelliknight-5820xl/intelliknight-5820xl_installation-manual_1271114059.webp)
Control Panel Installation
151137
4-35
4.12.3.2 Installing 2-Wire Class A Smoke Detector
To install a Class A two-wire smoke detector, wire as shown in Figure 4-35.
Figure 4-35 Two-Wire Class A Smoke Detector Connections
Note: In programming any point that uses multiple Flexput circuits, the lowest Flexput circuit number is used to
refer to the circuit pair. For example, Figure 4-35 uses both Flexput circuit 5 and 6, so in programming it
would be referred to as point 5.
Note:
Flexput circuit 5 and 6
used as an example.
Any Flexput point pairing
could be used.
Supervised
Power Limited
Содержание INTELLIKNIGHT 5820XL
Страница 16: ...IntelliKnight 5820XL Installation Manual 3 4 151137 Figure 3 1 Wire Routing Example ...
Страница 24: ...IntelliKnight 5820XL Installation Manual 3 12 151137 ...
Страница 68: ...IntelliKnight 5820XL Installation Manual 4 44 151137 ...
Страница 82: ...IntelliKnight 5820XL Installation Manual 5 14 151137 ...
Страница 104: ...IntelliKnight 5820XL Installation Manual 6 22 151137 ...
Страница 148: ...IntelliKnight 5820XL Installation Manual 7 44 151137 ...
Страница 162: ...IntelliKnight 5820XL Installation Manual 8 14 151137 ...
Страница 172: ...IntelliKnight 5820XL Installation Manual 9 10 151137 ...
Страница 178: ...IntelliKnight 5820XL Installation Manual 10 6 151137 ...