
www.sigineer.com
39
Note 1: If there’s only one inverter in L1-phase, the LCD will show as “HST”. If there is more than one
inverter in L1-phase, the LCD of the HOST inverter will show as “HST”, the rest of L1-phase inverters will
show as “2P0”.
Note 2: To avoid overload occurring, before turning on breakers in load side, it’s better to have whole
system in operation first.
Note 3: Transfer time for this operation exists. Power interruption may happen to critical devices, which
cannot bear transfer time.
3.8 Communication with Computer
The inverter can be monitored on the computer.
Please use the communication cable to connect to inverter and PC. Install the “SG Solar Power Monitor” on
a computer and follow on-screen instruction to install the monitoring software. For the detailed software
operation, please check user manual of software.
3.9 Grounding
Connect an AWG 8 gauge or greater copper wire between the grounding terminal on the inverter and the
earth grounding system or the vehicle chassis.
Содержание MS6048D
Страница 6: ...www sigineer com 4...