
www.sigineer.com
8
You must enable battery equalization function in monitoring LCD setting program 43 first. Then, you may
apply this function in device by either one of following methods:
1. Setting equalization interval in program 47.
2. Active equalization immediately in program 48.
When to Equalize
In float stage, when the setting equalization interval (battery equalization cycle) is arrived, or equalization is
active immediately, the controller will start to enter Equalize stage.
Equalize charging time and timeout
In Equalize stage, the controller will supply power to charge battery as much as possible until battery
voltage raises to battery equalization voltage. Then, constant-voltage regulation is applied to maintain
battery voltage at the battery equalization voltage. The battery will remain in the Equalize stage until setting
battery equalized time is arrived.
However, in Equalize stage, when battery equalized time is expired and battery voltage doesn’t rise to
battery equalization voltage point, the charge controller will extend the battery equalized time until battery
voltage achieves battery equalization voltage. If battery voltage is still lower than battery equalization
voltage when battery equalized timeout setting is over, the charge controller will stop equalization and return
to float stage.
The V Series pure sine wave inverter/charger is built with MPPT solar charging modules up to 100A.
Model #
AC Charging Current
MPPT Solar Charger
Max Charging Current
MS6048D
60A
80A
80A
The MPPT Solar Charger will automatically work when the inverter is powered off.
Even when the power switch is in unit off position, the built-in solar charger will automatically work when
PV input voltage and battery voltage is qualified, this is to optimize solar production for battery charging.
But the inverter will not convert battery power to AC output.
When the battery is fully charged, the inverter will keep the battery capacity at 100%, and convert the extra
PV power directly from DC to AC to power loads.
When the battery is fully charged, the voltage has to drop by 2 volts (or below 95% of SOC when BMS
communication is established) to activate the charger.
Содержание MS6048D
Страница 6: ...www sigineer com 4...