55
Now on the other side of the X-axis rail assembly, take a second flange bearing and slide it into place as shown. It
should fit into the bore on the right-hand side of the right-side steel plate.
There should still be three ACME locking nut assemblies that you’ve previously assembled. Grab one of these and
thread it onto the lead screw from the right, turning it all the way until it’s against the bearing, then tighten the set
screw to hold it in place. Make sure the nut is really tightened into place before tightening its set screw.
Содержание LongMill V1
Страница 1: ...1 LongMill V1 Assembly Manual V1 ...
Страница 4: ...4 Part 1 XZ Axis Gantry ...
Страница 22: ...22 The completed assembly should look like this ...
Страница 29: ...29 Part 2 Y Axis Gantries ...
Страница 34: ...34 Tighten until snug Don t overtighten Both sides should be mirrored ...
Страница 39: ...39 Once everything is finished getting put together it should look like this On to the next section ...
Страница 40: ...40 Part 3 X Axis Rail ...
Страница 43: ...43 Your completed rail should now look something like this ...
Страница 57: ...57 Part 4 Y Axis Rails ...
Страница 68: ...68 Part 5 Drag Chains and Wiring ...
Страница 81: ...81 Now plug in the cables for the motors on the two Y axis NEMA 23 stepper motors ...
Страница 83: ...83 Part 6 Electronics ...
Страница 93: ...93 Part 7 Table Mounting ...
Страница 97: ...97 ...