13
Once the pulley is secure, twist the ACME locking nut in from the other side so that the pulley and the nut are
sandwiching the two bearings. Once in place, tighten the M3 screw on the nut to hold it in place and ensure
there’s no play up and down. Adjust and tighten if necessary.
To put the belt into place: loosen the second pulley set screw, wrap the belt around it, slide the motor toward the
lead screw, then wrap the belt around the first pulley and install the second pulley onto the motor shaft.
This step keeps the lead screw constrained in the z-axis.
Содержание LongMill V1
Страница 1: ...1 LongMill V1 Assembly Manual V1 ...
Страница 4: ...4 Part 1 XZ Axis Gantry ...
Страница 22: ...22 The completed assembly should look like this ...
Страница 29: ...29 Part 2 Y Axis Gantries ...
Страница 34: ...34 Tighten until snug Don t overtighten Both sides should be mirrored ...
Страница 39: ...39 Once everything is finished getting put together it should look like this On to the next section ...
Страница 40: ...40 Part 3 X Axis Rail ...
Страница 43: ...43 Your completed rail should now look something like this ...
Страница 57: ...57 Part 4 Y Axis Rails ...
Страница 68: ...68 Part 5 Drag Chains and Wiring ...
Страница 81: ...81 Now plug in the cables for the motors on the two Y axis NEMA 23 stepper motors ...
Страница 83: ...83 Part 6 Electronics ...
Страница 93: ...93 Part 7 Table Mounting ...
Страница 97: ...97 ...