11
Next, slide the short end of the lead screw up through the flange bearings. It should slide in with little force; if
you’re having trouble then try wiggling the lead screw back and forth gently.
One of the long boxes is lighter than the other, it will contain the drag chains, lead screws, and the motor cables
(wrapped in paper). The drag chains and motor cables can be set aside until the end of the assembly. Get the
shortest lead screw that’s hiding in the paper wrap on one end, as well as an ACME locking nut assembly from
before. Thread the nut about an inch and a half down the length of the lead screw. Make sure the nut still has the
M3 screw for later locking it in place.
Содержание LongMill V1
Страница 1: ...1 LongMill V1 Assembly Manual V1 ...
Страница 4: ...4 Part 1 XZ Axis Gantry ...
Страница 22: ...22 The completed assembly should look like this ...
Страница 29: ...29 Part 2 Y Axis Gantries ...
Страница 34: ...34 Tighten until snug Don t overtighten Both sides should be mirrored ...
Страница 39: ...39 Once everything is finished getting put together it should look like this On to the next section ...
Страница 40: ...40 Part 3 X Axis Rail ...
Страница 43: ...43 Your completed rail should now look something like this ...
Страница 57: ...57 Part 4 Y Axis Rails ...
Страница 68: ...68 Part 5 Drag Chains and Wiring ...
Страница 81: ...81 Now plug in the cables for the motors on the two Y axis NEMA 23 stepper motors ...
Страница 83: ...83 Part 6 Electronics ...
Страница 93: ...93 Part 7 Table Mounting ...
Страница 97: ...97 ...