background image

42

Start by orienting the rails into a ‘lighting bolt’ pattern like in the photo so that the set of six holes on both can be 

aligned.  Also, make sure to check that the small threaded hole on the X-axis rail (yellow) is oriented as shown so 
that you’ll be able to attach your drag chain later on.

Grabbing the bag of short, large bolts, you can use six of these to fasten these parts together; the bolts will go 
through the larger holes on the reinforcement bar and thread into the X-axis rail from the back (pictured). Start by 
turning each of these short M8 bolts in by hand to get all the holes aligned, then go back and tighten each of them 
down well with a size 6 Allen key.

Содержание LongMill V1

Страница 1: ...1 LongMill V1 Assembly Manual V1 ...

Страница 2: ...l Part 4 Y Axis Rails Part 5 Drag Chains and Wiring Part 6 Electronics Part 7 Table Mounting Appendix Unboxing Part 1 XZ Axis Gantry Part 2 Y Axis Gantries Part 3 X Axis Rail Part 4 Y Axis Rails Part 5 Drag Chains and Wiring Part 6 Electronics Part 7 Table Mounting Appendix Unboxing ...

Страница 3: ...their shop Metric Allen keys or a drill and Allen driver bits Pliers or metric wrenches A small flat head screwdriver Rubber mallet optional The LongMill comes with a lot of parts but we ve organized them to make it as easy as possible to find and put everything together each kit comes with several cartons For the complete BOM visit https docs google com spreadsheets d 1xyy UfH2HbzT0Ood7SpQIxwkfFe...

Страница 4: ...4 Part 1 XZ Axis Gantry ...

Страница 5: ...nd another with medium sized nuts this is the M5 hardware you need Another one of the bags will be filled with 4 rectangular plastic blocks we ll be preparing these blocks for installing onto the XZ axis gantry and eventually on the Y axis as well Start by pressing the M5 nylock nuts into the hexagonal cutouts Make sure that you point the round end of the nut towards you as you want the first part...

Страница 6: ...r adjustment when your machine is assembled For these reasons we d recommend that you keep these aside and instead use some of the long M5 bolts Feel free to install the shorter set screws in their place once you ve got your machine running if you prefer them instead There will be another bag filled with four large nuts take the contents out and loosely thread all the set screws into the nuts only...

Страница 7: ...ACME locking nut assembly 608ZZ flange bearing x6 x2 Steel Z axis motor mount NEMA 23 motor threaded 200mm lead screw Get the paper wrapped Z motor plate the plastic Z axis mount and the bags full of medium sized bolts and nuts from the last step You ll also need the motor specifically labeled for the Z axis this one is specially threaded It will be labeled with a sticker or come with a laser engr...

Страница 8: ...ng away from the middle sized hole on the plate Loosely thread four M5 25mm bolts through the slots and the motor the plate slots may be a little tight but that s fine we ll be adjusting this part and re tightening the bolts later in the assembly Make sure to keep the round part of the nut facing towards you when pushing them in Screw the four M5 screws into the motor Ensure that the connector is ...

Страница 9: ...other Get the bag with bearings in it and use two when pressing them into the top and bottom bore on your assembly You should be able to get them on easily with your thumbs If you find resistance try adjusting the steel plate so that the bores on the plastic and steel line up Both flanges of each bearing should sit flush with no gap Bearing on the top Moving the motor back and forth and tilting th...

Страница 10: ... same bolts secure the plate and the 3D printed part together These should thread all the way through to the nuts that you placed earlier in the plastic mount Bearing on the bottom Mount the steel plate to the 3D printed part ...

Страница 11: ... other it will contain the drag chains lead screws and the motor cables wrapped in paper The drag chains and motor cables can be set aside until the end of the assembly Get the shortest lead screw that s hiding in the paper wrap on one end as well as an ACME locking nut assembly from before Thread the nut about an inch and a half down the length of the lead screw Make sure the nut still has the M3...

Страница 12: ...t have to unscrew the set screws a little with the included Allen key Orient the pulley so that the base is flush with the end of the lead screw then tighten the screws into place You might have to adjust the locking nut to make the lead screw and the top of the pulley flush Use an Allen key to tighten the set screws to hold the lead screw ...

Страница 13: ...w on the nut to hold it in place and ensure there s no play up and down Adjust and tighten if necessary To put the belt into place loosen the second pulley set screw wrap the belt around it slide the motor toward the lead screw then wrap the belt around the first pulley and install the second pulley onto the motor shaft This step keeps the lead screw constrained in the z axis ...

Страница 14: ... to line up one of the set screws with the flat part of the motor shaft to provide extra holding strength as shown in the photo Next make sure that the belt is tight around the two pulleys by pulling back the motor in the slot then tightening the M5 bolts that are holding it in place Loose belt Tight belt ...

Страница 15: ...try assembly in a labelled bubble mailer Once you take it out you ll see there s a small steel plate z gantry attached to big steel plate x gantry via two sliding rails First check that the movement of your z gantry is smooth by moving it up and down by hand There should be no binding and the gantry should move relatively smoothly Gantry should move smoothly with no binding Move up and down for a ...

Страница 16: ...ing the correct spacing between the gantry and the lead screw You ll need four of these assembled sets for now Set the assembly to the side and get the bag full of medium sized bolts washers and the v profile wheels Spilling out the wheels if you look down the center hole you ll notice that they have a bronze coloured inner ring which can sometimes off center pictured Use the included small Allen ...

Страница 17: ...d looking so they should be easy to identify If you move the z gantry to the middle on the XZ gantry assembly you ll notice 4 holes in a rectangular formation on the large steel plate The 4 sets of wheel assemblies go into these holes from behind the bottom two using a regular nut and the top two using an eccentric nut Start by fitting the eccentric nuts into the top pair of holes The round part o...

Страница 18: ...s into Install the v wheels ensuring that the washers are in place as well Now attach the bottom two v wheel sets These attach with regular M5 nylock nuts and need to be tightly fastened into place You can do this with a size 4 Allen key and an 8mm wrench or pliers ...

Страница 19: ...Tighten the wheels until snug All of your wheels should be facing the same way Once complete all of your wheels will be facing the backside of your gantry Check to make sure that each wheel turns smoothly ...

Страница 20: ...at attach to the XZ gantry assembly The first one we will assemble goes on the X gantry Use two M5 25mm bolts the same ones used to make the v wheel sets to mount the nut block Make sure that the M5 nuts are facing outwards pictured so that you can see them The block shouldn t be tightened down really hard just fasten it until it s snug ...

Страница 21: ...21 Now we ll do the same process on the Z axis on the two holes shown Screw in the next nut block making sure not to overtighten ...

Страница 22: ...22 The completed assembly should look like this ...

Страница 23: ...ther line up the lead screw from the motor assembly with the nut block of the gantry assembly If you use your fingers to turn the lead screw it will go into the nut The plastic mount should be coming in from the side of the steel plate which has a rectangular notch cut out If you have trouble turning the lead screw into the nut try loosening the bolts holding the nut to the plate Also be sure that...

Страница 24: ...r push it further into place to align the holes Get the bag of large nuts and the other with the largest and longest bolts you ll use a pair of each to fasten these two assemblies together Take the two large M8 nuts and push them into the back of the plastic Z axis mount If the nut fit is a little tight then you can use a size 6 Allen key or other tool to press it into place ...

Страница 25: ...m into place with a size 6 Allen key to secure the two assemblies together the bolts should be reasonably tight Your assembly should now look like this Fasten the M8 bolts Keep a finger on the M8 nuts if you are finding they pop out when you first start tightening the bolt Completed assembly up to this point ...

Страница 26: ... heights The lower set of holes will allow your router to gain more cutting depth whereas the upper set will mount the router more rigidly and allow for the full height clearance Use the upper set of holes to start Find your machine s included aluminum router mount it will be individually wrapped in paper and labelled appropriately mount pictured Also find the bag with very few medium sized bolts ...

Страница 27: ...the four shorter bolts into the upper set of holes Holding the router mount up to the bolts you should be able to fasten it into place with a size 4 Allen key The top set of holes in the Z gantry looking in from behind the current assembly Use the four M5 12mm bolts to mount the router mount ...

Страница 28: ...28 Your final assembly should look like this Congrats you ve completed the assembly of the XZ Axis Gantry That was fun wasn t it ...

Страница 29: ...29 Part 2 Y Axis Gantries ...

Страница 30: ...ese holes just like how you did before with the eccentric nuts placed as pictures and the nylock nuts on the two lower holes make sure that one is assembled as the mirror of the other Use a size 4 allen key and 8mm wrench or pliers to tighten everything down but leave the eccentric nuts slightly loose for now If you have a hard time getting the eccentric nuts in we recommend tapping the nuts in wi...

Страница 31: ...31 V wheel sets with a washer to keep the v wheel spaced from the gantry plate Fasten the wheels to the eccentric nuts leave these slightly loose for now ...

Страница 32: ...32 Assemble the bottom two wheels with M5 nylock nuts and tighten all the way Make sure you have both plates done but with the wheels on opposite sides ...

Страница 33: ...ts go on the same side as the v wheels do On the Y axis plates there are two holes for the anti backlash assemblies to mount Line up the plastic blocks and secure them to the plate using the same medium sized bolts that were used for the wheels The blocks should be mounted on the same side as the v wheels and have the tensioning screw facing outwards ...

Страница 34: ...34 Tighten until snug Don t overtighten Both sides should be mirrored ...

Страница 35: ...A 23 motor 35mm aluminum spacer M5 50mm bolt M5 nylock nut 6 35mm to 8mm coupler 608ZZ flange bearing 3D printed drag chain mount Left Y Axis Gantry Mounting the X axis motor to the left plate Make sure you have grabbed the correct gantry pictured below ...

Страница 36: ... solid or jaw type but they both work the same way jaw type shown below Start off by attaching the coupler to the motor shaft making sure you have the smaller hole sliding onto the shaft and the larger hole facing up so that we can put the lead screw on later Put the coupler down as far as it will go and loosely tighten the screw to secure it for now We will adjust this later so there is no need t...

Страница 37: ...he motor bolts and standoffs into place Take note of the position of the white motor connector in terms of its rotation and what side of the plate you are mounting it onto the side with the wheels Take note of the direction of the motor connector Attach motor using M5 nylock nuts ...

Страница 38: ... the orientation shown We ve found that it is easiest if you clip on one side first then swivel the other side on afterwards Use the four M5 nylock nuts to secure the plate side of the M5 bolts This requires a size 4 Allen key and an 8mm wrench or pliers If it s easier start by finger tightening all four nuts to keep everything in place before using the pliers to finish tightening ...

Страница 39: ...39 Once everything is finished getting put together it should look like this On to the next section ...

Страница 40: ...40 Part 3 X Axis Rail ...

Страница 41: ...the other rails Of the two the longer one is the X axis rail and the shorter one is the reinforcement You can also distinguish the two since the X axis rail has sets of four threaded holes at its ends Note The 12 12 LongMill is a smaller build envelope so it doesn t require an X axis reinforcement bar Move onto the next step Attaching the Shoulder Brackets but keep in mind that the remaining pictu...

Страница 42: ...so that you ll be able to attach your drag chain later on Grabbing the bag of short large bolts you can use six of these to fasten these parts together the bolts will go through the larger holes on the reinforcement bar and thread into the X axis rail from the back pictured Start by turning each of these short M8 bolts in by hand to get all the holes aligned then go back and tighten each of them d...

Страница 43: ...43 Your completed rail should now look something like this ...

Страница 44: ...e bracket in the right direction Get the plastic L shaped shoulder parts from the pile of plastic parts next These go onto the two ends of the aluminum rail each fastened with four of the bolts from the bag of short large bolts Line each up with the holes first with the flat part of the bracket facing out pictured before turning the bolts on by hand ...

Страница 45: ...45 Finish securing the M8 bolts with a size 6 Allen key being sure not to over tighten them Brackets attached on both ends ...

Страница 46: ...he X axis rail These assemblies will all be coming together in this step starting by sliding the XZ axis gantry assembly onto the X axis rail DO NOT stand the completed assembly up on the v wheels it can roll away or become unbalanced which may cause it to fall and become damaged just leave it laying on its back for the next steps You can consider propping it up at an angle as well if you don t wa...

Страница 47: ... still loose then you ll be able to use an 8mm wrench or a pair of pliers to rotate the nut into the correct position Once the eccentric nut is where you want it re tighten the bolt with a size 4 Allen key to secure the nut into position Do this for both nuts Before we start you want to make sure that the eccentric nuts on the XZ gantry are positioned correctly this can be checked visually Since t...

Страница 48: ...olts with an Allen key rotating the nut a small amount re tightening the bolts and then checking the looseness of the wheels with your fingers A properly tensioned system should roll smoothly along the rail but it should be difficult to use your fingers to turn the wheels by hand while the gantry is stationary Lay the X axis rail down along its length with the inside of the L shape facing you and ...

Страница 49: ...t out as you mount the plate These parts are a tight fit so that twisting in the X axis can be kept to a minimum so using a mallet and some coercion may be necessary but most importantly take your time Line up the slot to the rail carefully and tap it into place until the Y gantry is up against the plastic shoulder bracket Once you get the plate on get the bags of large nuts and the largest longes...

Страница 50: ... same process on the other side being careful not to cause damage to the motor or the drag chain mount in the process Now that the larger X axis assembly is done this is what the completed assembly should look like ...

Страница 51: ...his step to be earlier pay no mind to the other parts in the picture Start by grabbing the lead screws which you set aside much earlier in the assembly Your LongMill comes with three lead screws not accounting for the earlier one which was used for the Z axis For the 12 12 and 30 30 they re all the same length and for the 12 30 the longer one is for this X axis assembly Get your lead screw and run...

Страница 52: ...52 Push the lead screw into the bearing Turn the lead screw into the nut with your hand Push the lead screw into the opposite bearing Dont push it all the way into the coupler just yet ...

Страница 53: ...53 Putting an M8 washer between the coupler and bearing Line up the M8 washer between the coupler and the bearing and slide the lead screw through all three ...

Страница 54: ...d screw to the coupler Loosen the screw securing the coupler on the motor so that you can push it into the flange bearing Use an Allen key or other tool to push the face of the coupler into the bearing This will ensure that there is no play left and right in the lead screw Fully re tighten the set screw on the motor shaft to hold everything in place ...

Страница 55: ...of the right side steel plate There should still be three ACME locking nut assemblies that you ve previously assembled Grab one of these and thread it onto the lead screw from the right turning it all the way until it s against the bearing then tighten the set screw to hold it in place Make sure the nut is really tightened into place before tightening its set screw ...

Страница 56: ...ood idea to check that everything is secure by gently pulling on the lead screw to check for any looseness Adjust the couplers and tighten the ACME lock nut more if you feel any play since you should be able to rotate the lead screw freely but not feel any side to side looseness ACME lock nut on all the way Check for play by gently pulling on the lead screw both ways ...

Страница 57: ...57 Part 4 Y Axis Rails ...

Страница 58: ...b assemblies The two Y axis rails mount to the machine base via a handful of plastic feet which require a bit of assembly before hand Start off by finding the front and back pairs among the plastic parts pictured These parts can be distinguished by their zig zag like pattern with a thick base and by the embossed lettering denoting their position on the machine e g Back left and Back right ...

Страница 59: ...ar feet from the rear pictured make sure that you get the orientation right on these These bearings are meant to be quite a snug fit so feel free to use a vise or a mallet against the outer flange of the bearing to get them properly seated into the feet You ll know they re in all the way once the flange is completely flush with the surface Front feet with bearings Rear feet with bearings ...

Страница 60: ...hese medium sized nuts open from earlier in the assembly Now we ll attach the two remaining motors to the rear feet Install the coupler onto the motor first followed by the long bolts and spacers that were used for the X axis motor assembly Put M5 nylock nuts into each nut catch on the rear feet Loosely push the coupler over the motor shaft ...

Страница 61: ...tic feet orienting the motors white connector towards the flat base of the foot pictured Using a size 4 Allen key you ll be able to bolt the motor in place Repeat the process for the other foot Both feet with motors attached Install the bolts and spacers ...

Страница 62: ...hile the 12 12 and 12 30 models have 500mm long rails These will be the last two remaining aluminum lengths in the kit distinguishable by their 2 width compared to the 3 width of the X axis rail We will be doing the assembly for the 30 30 here but the assembly for all three versions is very similar Start by grabbing the two Y axis rails the feet assemblies from the last step and the bag of the lar...

Страница 63: ...o the larger X axis rail assembly that you have set aside To prepare for this flip the X axis assembly onto its front so that the router mount is contacting the ground be sure that it s stable in this position You should also check the current state of the eccentric nuts on both Y gantries Just like when you checked them on the XZ axis gantry they should be in their outer most position so that the...

Страница 64: ...hort large bolts in preparation for this next step You ll have to make a combined motion where you tilt the X axis rail assembly backwards while you finish sliding the Y axis rails all the way on Be very careful while doing this It s possible to loose control of the heavy components and have them fall away from you and become damaged Once you ve slid the rails all the way on to the X axis rail ass...

Страница 65: ... thread the lead screws into place It will go through the bearing on the front foot threaded through the nut block on the Y gantry and through the bearing on the back foot If you move the gantry to the back of the machine when doing this pictured it ll require less time to thread it through Thread the lead screw into the nut ...

Страница 66: ...rain the lead screws on the Y axis These share the same purpose with the locking nuts on the X and Z axes where the combination of the nut on one side and the coupler on the other side keeps the lead screws from moving side to side so it s a good idea to check that everything is secure by gently pushing and pulling on the lead screw to check for any looseness Do this on both sides Adjust the coupl...

Страница 67: ...t like the other feet they can be attached using two of the short M8 bolts and a size 6 Allen key It s best to twist the bolts into place by hand first then finish tightening them snug with the Allen key If you have a 12x12 or 12x30 LongMill there will only be one foot to attach to the right rail which will only require 2 of the M8 bolts to attach it Mount the middle feet in the spots indicated Si...

Страница 68: ...68 Part 5 Drag Chains and Wiring ...

Страница 69: ...he LongMill so that they aren t in the way during cutting They also keep wires from wearing out from bending or being cinched around corners As mentioned previously the chains can be found in the lighter long box pictured They come with detachable links so that you can adjust their length depending on the size of your LongMill You can save these links for later when you upgrade to a larger LongMil...

Страница 70: ...as shown in the photos A flat head screwdriver or thin shim can also be handy for this just be careful not to cut yourself in the process For the pin type end link squeeze the two sides of the link together then twist and pull to disconnect For the hole type end link pull on one side of the link then twist it away to separate it ...

Страница 71: ...shape and the nut catches and wire clips it has on its back side Also locate the small bag containing smaller bolts and nuts as these will be used to attach the links in the following steps Use a pair of bolts and nuts to secure the hole type end link onto the drag chain foot in the orientation shown by using a size 3 Allen key The nuts should fit into the hexagonal cutouts underneath the mounting...

Страница 72: ...ow all the other feet have been mounted Now get a pin type end link pictured to mount the other end of the drag chain This one will attach the the X axis clip on mount where there s a slot for the two bolts to fit through Use pliers or a 7mm wrench to hold the nuts from the top while you fasten the bolts from underneath with a size 3 Allen key Drag chain foot mounted in place ...

Страница 73: ...should only need one bolt to secure the pin type end link using the tapped hole but if your hole is not tapped use an M4 nylock nut on the other side to secure the part Find the hole on the X axis rail to secure the drag chain link Use an M4 nylock nut on the other side of the aluminum angle if needed ...

Страница 74: ...t to disconnect Set aside the remaining unused links for later they can come in use if you re planning on upgrading to a larger sized LongMill later Link fastened into place Lastly we ll attach the final drag chain end link onto the plastic arm of the Z axis mount using another pair of M4 bolts and nuts Note the direction the link is facing before installing it ...

Страница 75: ...the halfway point On the 12 12 LongMill both chains need to be shortened to about 24 links long This is a little over half the length of the existing drag chains so it s easiest to just fold it in half and add a couple links onto the halfway point We ll then start to unclip the tabs that hold the wires in the drag chain pictured These tabs are designed with clips on both side so that they can be r...

Страница 76: ...remove every other cover tab since the wire will still be held in just as well but opening and closing them will take half the time You can stick the extras into a baggy to save for later if you wish At this stage it s a good idea to grab the router you ll be using with your machine We ll show these steps using the Makita RT0700 RT0701 trim router that we recommend Also grab the paper wrapped moto...

Страница 77: ...th between the two bolts to keep them parallel and make sure not to over tighten them If you do over tighten these bolts and start to strip the bolt head these bolts can be substituted with the M5 bolts that came with your machine if you have any extras It s also best to face your router power cable towards the right side pictured since the dust shoe hose port sticks up on the left side of the rou...

Страница 78: ...ake sure that you have the correct end of the drag chain with a pin type link so that you ll be able to connect it to the mounted end link pictured and so that the drag chain can bend in the right direction against the X axis You can start to re clip the tabs in place Clip the end of the drag chain to the end link on the Z axis mount ...

Страница 79: ...79 Swing the drag chain and clip it onto the end link attached to the X axis rail Pull the wires through Now attach a motor cable onto the X axis NEMA 23 stepper motor ...

Страница 80: ...n Clip the tabs in to secure the wires and make sure that the drag chain is facing the right direction with the hole type link pictured to fit into the correct end links Clip the both ends of the drag chain into the previously mounted end links on the Y gantry and the drag chain foot Grab the Y axis drag chain and insert the X and Z axis motor cables and router cable ...

Страница 81: ...81 Now plug in the cables for the motors on the two Y axis NEMA 23 stepper motors ...

Страница 82: ...82 Bring the cables around to the left of the machine and slot them into the wiring cutouts in the drag chain foot With all of the wiring coming in from the left he machine wiring should now be complete ...

Страница 83: ...83 Part 6 Electronics ...

Страница 84: ...e or red on the left side and black on the right when the screw terminal is facing you as pictured Check that the wires are connected securely by tugging on them Secure them using the screw terminals and a flat head screwdriver if they re loose or disconnected If you re unable to get the tinned wire ends to clamp inside the connector securely then consider snipping the wires ends off and removing ...

Страница 85: ... if needed As previously also check that the wires are connected securely to the connector While you re at it double check that the motor side white connectors on each axis are pushed all the way into the motor housing to ensure a good connection If these connectors are sitting too loosely then they can cause issues later on since the motor won t move as expected The wiring color pattern should be...

Страница 86: ... that you can reach in with a small flat head screwdriver or an allen key to adjust these switches without dissembling anything These DIP switches normally look like they ve been properly switched when in reality they re floating between the up and down positions as is the case for switch 2 in the picture below Because of this it s a good idea to push every single switch into it s correct position...

Страница 87: ...e sure to push them ALL THE WAY in so that there is good contact between the plug and the connector Each plug on the board is labelled on the top note that there isn t a difference between the Y1 and Y2 plugs the Y axis motors can be connected to either of them Next plug the DC connector into the LongBoard before plugging the power supply into the wall a green LED on the power supply brick should ...

Страница 88: ...ough crimp able wire extenders Connecting the LongMill to your computer To manipulate your LongMill and send it files you ll need a g code sender which acts as the control software We recommend using UGSPlatform which is what we ll be using to show the next couple of steps and in the remaining part of the assembly You can download UGSPlatform here bit ly 2Z3DIVC Note Some users have reported some ...

Страница 89: ...you are using a 32 bit Windows computer use ugsplatform exe If you are not sure which type of Windows you are using you are most likely using a 64 bit computer You can try both and see which one starts If you are using a Mac OS computer use ugsplatform You should be greeted with a screen that looks like this If you aren t and you encounter an error while opening UGS because it s not able to locate...

Страница 90: ... point if they are not already on your computer can take a minute or two If you try to connect your machine but you cannot you may need to manually install the drivers You can do this by installing the Arduino IDE which will install the drivers during the installation or you can follow the instructions on doing them manually for Windows Plug in the USB cable onto the LongBoard ...

Страница 91: ...ings connected to your USB ports you may have a few different options to choose from You can either unplug the other items you have plugged in or you can try connecting to each one to see if they make a connection At this stage power on your machine Finally click on the highlighted Connect button If your machine connects successfully you should see this icon turn orange and you should see in the c...

Страница 92: ...e XZ and 1mm for the Z step size as well as 1000mm min for the feed rate You can adjust this as needed Moving the machine around will be important for when we mount the machine to the wasteboard next Note Once you ve connected to your machine via UGS or your preferred interface software go to the console communication tab and type in 110 4000 and hit the Enter key This will modify the maximum feed...

Страница 93: ...93 Part 7 Table Mounting ...

Страница 94: ...ed dollars in shipping and is very easy to damage during transit You can usually find a full 4ftx8ft sheet of 3 4 MDF for under 60 at your local lumber or hardware store 2 Users can choose the size and material of the wasteboard to match their needs Suitable wasteboard materials The easiest setup that we recommend is a flat clean piece of 3 4 MDF to act as your mounting surface and your wasteboard...

Страница 95: ...l be suitable The control box is also something you should plan for as the design of the machine favours placing the control box on the left side of the machine whether it s sitting on the table or mounted to the side or underside of the surface The control box has buttons on the top which can Play Pause and Stop the machine s motion so it s a good idea to keep it mounted near your CNC It also has...

Страница 96: ... 5mm off the right side 5 The width of the foot area is determined by the distance between the middle feet not the front and back feet since the middle feet sit slightly wider than the front and back feet do 6 The red cutting area is based about the center point of the router thus you can plane an area larger than what s stated if you re using a large surfacing bit add your bit diameter to the wid...

Страница 97: ...97 ...

Страница 98: ...centric nuts We will also properly tension the Delrin anti backlash nuts Turn the tensioning screw a little bit at a time Check for play by moving the gantry back and forth and seeing if there is any excess movement Do not over tighten usually a half turn is more than enough Gently put your LongMill on the mounting surface and shuffle it over roughly where you want it In this case we re using a 4 ...

Страница 99: ...ch foot has two holes for mounting where the shortest screws are meant for the inside and the longer one are for the outside Please note that the 2 screws WILL go through 3 4 MDF but were still included since they can hold the LongMill feet down better If you choose to use them make sure that the surface under the board will not be damaged if you have screws coming out the bottom Once positioned s...

Страница 100: ...n by moving the machine a couple of inches forward and mount the inside of the top and bottom feet using two wood screws 1 1 4 Next we ll put screws in the other two spots on the same side this time on the middle feet ...

Страница 101: ...s At this point one side of your machine will be fully secure The technique to make sure the other side is mounted parallel to the first side is by running the gantry between its limits and mounting the other side as you move it along the length Start by mounting the top left foot on the inside ...

Страница 102: ...102 Move the machine down so that it is roughly in the middle of it s length then secure the insides of the next two feet Finally move it to the front and secure the inside of the front left foot ...

Страница 103: ...first jobs If you ve got the touch plate or the dust shoe add ons alongside your machine you can see our pages on how to get those assembled and set up https sienci com dmx longmill dust shoes You can also navigate to the Post Build section of the LongMill resources if you d like to try out one of our easy starter projects learn how to maintain your machine or would like to address some issues you...

Страница 104: ... make it as easy as possible to find and put everything together each kit comes with several cartons For the complete BOM visit https docs google com spreadsheets d 1xyy UfH2HbzT0Ood7SpQIxwkfFexDDY BOZeApSEc3IM edit Top Carton 1 When you first open the top carton 1 it should look like this ...

Страница 105: ...ckers including long ones for the LongMill and some with Louis on the machine Andy s dog and our unofficial mascot and CEO parts for the dust shoe if you ordered it including two hardware bags one for assembling the dust shoe and one for mounting it a backing plate and 2 aluminum extrusions ...

Страница 106: ...106 The touch plate in the yellow padded envelope if you ordered it The end mill add on pack if you ordered your machine through Kickstarter ...

Страница 107: ...107 Aluminum router mount in the size you requested Hardware bag 1 which contains M8 25 x12 M8 hex nut x12 M5 25 x35 M5 12 x5 M5 nylock nut x35 M5 washer x14 M4 16 x10 M4 hex nut x10 ...

Страница 108: ...ange bearing x8 Delrin block nut x4 Pulleys and belts x2 ACME locking nut with M3 set screw x4 1 4 to 8mm coupler x3 Hardware bag 3 which contains M8 16 x30 M8 washer x4 M5 50 x12 Aluminum standoff x12 1 25 1 5 and 2 board screws x10 each Eccentric nut x6 ...

Страница 109: ...109 Three unthreaded motors X Y axis and one threaded motor Z axis The power brick with its AC power cable inside a white cardboard box ...

Страница 110: ...110 A bagged USB cable type A to type B The electronic control box protected by grey padded foam the three orange components won t be there for most machines ...

Страница 111: ...from left to right and top to bottom Back feet pair Front feet pair Drag chain mount Shoulder brackets x2 Middle feet x3 for the 30 30 and x1 otherwise Drag chain foot Z axis mount Top Carton 2 When you open the top carton 2 it should look like this ...

Страница 112: ...112 XZ gantry sub assembly protected within a padded envelope Z motor plate a piece of 1 8 thick steel protected by paper wrapping ...

Страница 113: ...h pieces of 1 4 thick steel protected by paper wrapping Top Carton 3 If you ordered a Makita Router with your Longmill it can be found here if not this box will remain empty to help keep top cartons 1 and 2 secure during shipping ...

Отзывы: