17
Twist two of the v-wheel sets into the eccentric nuts from the other side. These don’t need to be tight yet, so just
attach them by hand for now.
Make sure to have the eccentric nuts in the right holes, and that the bore is sitting inside the hole.
Install the first two v-wheels from the other side.
You’ll also need two of the medium-sized M5 nuts from the last step and you’ll also need to grab the bag of
eccentric nuts. These come in a small bag of 6 and are very odd looking so they should be easy to identify.
If you move the z-gantry to the middle on the XZ-gantry assembly, you’ll notice 4 holes in a rectangular formation
on the large steel plate. The 4 sets of wheel assemblies go into these holes from behind, the bottom two using a
regular nut and the top two using an eccentric nut. Start by fitting the eccentric nuts into the top pair of holes. The
round part of the bore should sit inside of the hole, with the hex part facing out.
If you have a hard time getting the nuts in, we recommend tapping them in with the back of a screwdriver or other
dull object. This will help clear the excess paint that might still remain in the hole.
Содержание LongMill V1
Страница 1: ...1 LongMill V1 Assembly Manual V1 ...
Страница 4: ...4 Part 1 XZ Axis Gantry ...
Страница 22: ...22 The completed assembly should look like this ...
Страница 29: ...29 Part 2 Y Axis Gantries ...
Страница 34: ...34 Tighten until snug Don t overtighten Both sides should be mirrored ...
Страница 39: ...39 Once everything is finished getting put together it should look like this On to the next section ...
Страница 40: ...40 Part 3 X Axis Rail ...
Страница 43: ...43 Your completed rail should now look something like this ...
Страница 57: ...57 Part 4 Y Axis Rails ...
Страница 68: ...68 Part 5 Drag Chains and Wiring ...
Страница 81: ...81 Now plug in the cables for the motors on the two Y axis NEMA 23 stepper motors ...
Страница 83: ...83 Part 6 Electronics ...
Страница 93: ...93 Part 7 Table Mounting ...
Страница 97: ...97 ...