23
Parts Needed:
XZ-axis gantry sub-assembly
Z-axis motor sub-assembly
M8-25mm bolt
M8 nut
x2
x2
Previously Assembled
Connecting the two major sub-assemblies
Get the motor sub-assembly from before. Holding it in one hand, and the gantry sub-assembly in the other, line up
the lead screw from the motor assembly with the nut block of the gantry assembly. If you use your fingers to turn
the lead screw, it will go into the nut. The plastic mount should be coming in from the side of the steel plate which
has a rectangular notch cut out.
If you have trouble turning the lead screw into the nut, try loosening the bolts holding the nut to the plate. Also, be
sure that the tensioning bolt (sticking upwards) is completely loose.
Содержание LongMill V1
Страница 1: ...1 LongMill V1 Assembly Manual V1 ...
Страница 4: ...4 Part 1 XZ Axis Gantry ...
Страница 22: ...22 The completed assembly should look like this ...
Страница 29: ...29 Part 2 Y Axis Gantries ...
Страница 34: ...34 Tighten until snug Don t overtighten Both sides should be mirrored ...
Страница 39: ...39 Once everything is finished getting put together it should look like this On to the next section ...
Страница 40: ...40 Part 3 X Axis Rail ...
Страница 43: ...43 Your completed rail should now look something like this ...
Страница 57: ...57 Part 4 Y Axis Rails ...
Страница 68: ...68 Part 5 Drag Chains and Wiring ...
Страница 81: ...81 Now plug in the cables for the motors on the two Y axis NEMA 23 stepper motors ...
Страница 83: ...83 Part 6 Electronics ...
Страница 93: ...93 Part 7 Table Mounting ...
Страница 97: ...97 ...