82/88
Siemens Synco
900
CE1C2707en
Building Technologies
Index
05.07.2007
door
configuration .................24
contacts ........................48
function.........................24
name ............................24
state output...................36
doors / windows .................37
electric heater.....................20
ERF910 ........................36, 55
expert level.........................15
external DHW.....................21
factory setting........... 3, 79, 80
fault
delete............................76
history...........................76
inputs............................26
outputs..........................27
status messages bus....26
file name.............................76
flow temperature
max...............................77
min................................77
forced charging DHW.........73
frost protection setpoint ......71
guide value...........................3
heat demand
0..10 V ..........................32
relay..............................32
heating / cooling ...........29, 38
heating operating mode .....28
holes ..................................10
Input configuration..............27
installation regulations........12
integral action time .............68
knockout holes ...................10
lamp
configuration .................25
name ............................25
legionella protection
frequency......................71
period ...........................72
setpoint.........................71
time...............................71
limitation setpoint ...............65
manual control SSA955 .....80
max flow temperature.........77
maximum charging time .....73
meteo sensor ..................... 46
min flow temperature ......... 77
min valve
position comfort............ 67
mounting
location........................... 8
procedure ..................... 10
regulations...................... 8
neutral zone ....................... 69
number of devices.............. 79
numbering inputs ............... 54
operating mode contact ..... 28
operation external DHW..... 21
output configuration ........... 31
overriding the valves .......... 65
password expert................. 64
P-band ............................... 68
preparing the connection ... 14
product liability ..................... 7
programming mode............ 61
progression
atmospheric pressure... 37
outside temperature ..... 37
proportion room unit........... 66
pump overrun time ............. 65
QAA910 ............................. 40
QAW910 ............................ 39
QAX910 ............................. 14
quitting commissioning....... 63
radio connection test.......... 57
relays for switching groups 24
remote setting clock slave.. 61
reset peripheral devices..... 80
RF repeater
configuration................. 36
connection.................... 55
rise room temperature........ 66
room
configuration................. 16
name ............................ 16
temperature rise ........... 66
type .............................. 16
unit proportion .............. 66
RRV912 ............................. 42
RRV918 ............................. 42
running time actuator ......... 70
Содержание Synco 900
Страница 1: ...Synco 900 Mounting and commissioning Edition 2 0 Controller series B CE1C2707en 05 07 2007 ...
Страница 2: ......
Страница 84: ...84 88 Siemens Synco 900 CE1C2707en Building Technologies 05 07 2007 ...
Страница 85: ...85 88 Siemens Synco 900 CE1C2707en Building Technologies 05 07 2007 ...
Страница 86: ...86 88 Siemens Synco 900 CE1C2707en Building Technologies 05 07 2007 ...
Страница 87: ......