Connect door contacts
Inform the central apartment unit that a door / window contact wave
AP 260 is to be connected as door contact:
Main menu > Commissioning > RF connections > Doors > Door X (1 - 2)
> Connect device:
Confirm sub item "Connect device" by pressing the
Menu/ok
button.
You are prompted to press the connection button on the device to be
connection to establish connection.
The door / window contact is connected by pressing the function
button on the door / window contact for at least one second. After the
learning telegrams are sent, the LED blinks for about 3 seconds.
Successful connection is displayed on the central apartment unit and
confirmed by a beep. Finish the connection procedure by pressing
the
Menu/ok
- button.
Connect fault inputs
Inform the central apartment unit that a universal input B of a heating
circuit controller or a door / window contact wave AP 260 should be
connected as a fault input:
Main menu > Commissioning > RF connections > Faults >
Fault input X (1 - 4) > Connect device:
Confirm subentry “Connect device“ by pressing the
Menu/ok
button.
To make the connection, you is prompted to press the binding button
on the device to be connected.
If you want to use a universal input B of a heating circuit controller as
a fault input, select it with the channel selection button (CH) and
press the multifunction button. The LED lights up green. When it
starts blinking, you can release the binding button.
If you want to use a door / window contact wave AP 260 as a fault
input, press the button on the door / window contact for about 1 sec-
ond. Then, the LED blinks for a few seconds.
A successful connection is shown on the display of the central apart-
ment unit and be confirmed with a beep. Close the binding process
by pressing the
Menu/ok
button.
Connect fault outputs
Inform the central apartment unit that you want to use a universal
relay output Qx of a heating circuit controller as a fault output:
Main menu > Commissioning > RF connections > Faults >
Fault output X (1 - 2) > Connect device:
Confirm subentry “Connect device“ by pressing the
Menu/ok
button.
To make the connection, you is prompted to press the binding button
on the device to be connected.
Содержание Synco 900
Страница 1: ...Synco 900 Mounting and commissioning Edition 2 0 Controller series B CE1C2707en 05 07 2007 ...
Страница 2: ......
Страница 84: ...84 88 Siemens Synco 900 CE1C2707en Building Technologies 05 07 2007 ...
Страница 85: ...85 88 Siemens Synco 900 CE1C2707en Building Technologies 05 07 2007 ...
Страница 86: ...86 88 Siemens Synco 900 CE1C2707en Building Technologies 05 07 2007 ...
Страница 87: ......