65
PBD-51041038
SITRANS LG240 - Operating Instructions
44286-EN-171021
1
2
3
Fig. 38: Seal - Process fitting
1 Position of the seal - Process fitting
2 Hole for leakage detection
3 Process fitting, e.g. Clamp
8. Screw the process fitting by hand onto the thread of the sensor.
9. Tighten the process fitting with a suitable wrench with a torque of
20 Nm (14.75 lbf ft).
10. Screw the rod carefully by hand into the thread on the process
fitting.
11. Exert counterforce manually and tighten the rod on the flat sur-
faces with a torque of max. 4.5 Nm (3.32 lbf ft).
Information:
Please maintain the specified torque so that the max. tensile strength
of the connection remains.
9.8 Software update
The following components are required to update the sensor soft-
ware:
•
Sensor
•
Voltage supply
•
PC with PACTware
•
Current sensor software as file
Содержание SITRANS LG240
Страница 2: ...2 PBD 51041038 SITRANS LG240 Operating Instructions 44286 EN 171021 ...
Страница 85: ...Notes 85 PBD 51041038 SITRANS LG240 Operating Instructions 44286 EN 171021 ...
Страница 86: ...Notes 86 PBD 51041038 SITRANS LG240 Operating Instructions 44286 EN 171021 ...
Страница 87: ...Notes 87 PBD 51041038 SITRANS LG240 Operating Instructions 44286 EN 171021 ...