Punching and Nibbling (N4)
15.2 Stroke control
Turning, Milling, Nibbling
Function Manual, 11/2012, 6FC5397-1CP10-5BA0
267
Note
The "Stroke active" signal is high-active for reasons relating to open-circuit monitoring.
The chronological sequence of events for punching and nibbling is controlled by the two
signals A
0
and E
0
:
A
0
Set by the NCK and identical to stroke initiation.
E
0
Defines the status of the punching unit and identical to the "Stroke active" signal.
The signal states characterize and define times t
1
to t
4
in the following way:
t
1
The motion of the workpiece (metal sheet) in relation to the punch is completed at instant t
1
.
Depending on the criterion defined for stroke initiation (see Section "Auto-Hotspot"), the high-
speed output A
0
is set for punch initiation
①
.
t
2
The punching unit signals a punch movement via high-speed input E
0
at instant t
2
.
This is triggered by signal A
0
②
.
For safety reasons, signal E
0
is high-active (in the case of an open circuit, "Stroke active" is
always set and the axes do not move).
The "Stroke active" signal is not reset again until the tool has moved away from the metal
sheet (t
4
).
t
3
The NC reacts to the "Stroke active" signal at instant t
3
by canceling the "Stroke initiation"
signal
③
. From this point in time onwards, the NC is in a waiting state. It simply waits for
cancellation of the "Stroke active" signal so it can initiate the next axis motion.
The next stroke can be initiated only after signal A
0
has disappeared.
t
4
The punching operation is complete at instant t
4
, i.e. the punch has exited from the metal sheet
again.
The NC reacts to a signal transition in signal E
0
by starting an axis motion
④
.
The reaction of the NC to a signal edge change ④ is described in the section headed "Axis
start after punching".
Note
The stroke time is determined by the period Δt
h
= t
4
- t
1
.
Reaction times at instant t
4
between the signal transition of E
0
and the start of the axis
motion must also be added.
Содержание SINUMERIK 802D sl
Страница 58: ...Axis Monitoring A3 2 6 Data lists Turning Milling Nibbling 58 Function Manual 11 2012 6FC5397 1CP10 5BA0 ...
Страница 84: ...Travel to fixed stop F1 5 6 Data lists Turning Milling Nibbling 84 Function Manual 11 2012 6FC5397 1CP10 5BA0 ...
Страница 114: ...Gantry axes G1 6 8 Data lists Turning Milling Nibbling 114 Function Manual 11 2012 6FC5397 1CP10 5BA0 ...
Страница 260: ...Measurement M5 13 6 Data lists Turning Milling Nibbling 260 Function Manual 11 2012 6FC5397 1CP10 5BA0 ...
Страница 314: ...Positioning Axes P2 17 3 Data lists Turning Milling Nibbling 314 Function Manual 11 2012 6FC5397 1CP10 5BA0 ...
Страница 332: ...Reference Point Approach R1 18 6 Data lists Turning Milling Nibbling 332 Function Manual 11 2012 6FC5397 1CP10 5BA0 ...
Страница 340: ...Rotary Axes R2 19 4 Data lists Turning Milling Nibbling 340 Function Manual 11 2012 6FC5397 1CP10 5BA0 ...
Страница 368: ...Spindle S1 20 9 Data lists Turning Milling Nibbling 368 Function Manual 11 2012 6FC5397 1CP10 5BA0 ...
Страница 390: ...Tangential Control T3 22 5 Data lists Turning Milling Nibbling 390 Function Manual 11 2012 6FC5397 1CP10 5BA0 ...
Страница 422: ...Feed V1 24 4 Data lists Turning Milling Nibbling 422 Function Manual 11 2012 6FC5397 1CP10 5BA0 ...
Страница 440: ...Appendix A 2 Overview Turning Milling Nibbling 440 Function Manual 11 2012 6FC5397 1CP10 5BA0 ...
Страница 458: ...Glossary Turning Milling Nibbling 458 Function Manual 11 2012 6FC5397 1CP10 5BA0 ...