Appendix
A.4 Acceptance test/configuration test
Power Module PM330
138
Hardware Installation Manual, 12/2018, A5E32844552B AF
Status
3. Activate SS1-t
3.1. Activate SS1-t while the motor is running.
3.2.
Check the following:
•
The motor brakes along the OFF3 ramp.
•
OFF3 ramp is active (r0899.5 = 1)
•
After the "SS1-t delay time" expires, the inverter signals:
r0002 = [44] Switching on inhibited – connect 24 V to terminal STO (hardware)
•
The inverter signals neither faults nor alarms.
3.3. Check the status LEDs of the safety relay
(here in the example, a 3SK112x-…)
•
LED (1) DEVICE = green
•
LED (2) OUT = green/yellow flashing
–
-> instantaneous (non-delayed) output circuit of the 3SK1 open. (OFF2 control)
–
-> delayed output circuit of the 3SK1 still closed. (STO circuit)
•
After the time set at the 3SK1 rotary controller has expired
LED (2) OUT = off -> both 3SK1 output circuits open
•
LED (3) IN = off -> 3SK1 switch-on (close) conditions not satisfied
–
Here, input circuit closed
•
LED (4) SF = OFF
4. Deactivate SS1-t
4.1. Deactivate SS1.
4.2. Check the following:
•
STO is not active (r0002 ≠ 44).
(e.g. R0002 = [31] Ready for switching on – set "ON/OFF1" = "1/0" (p0840)
•
The inverter signals neither faults nor alarms.
4.3. Check the status LEDs of the safety relay
(here in the example, a 3SK112x-…)
•
LED (1) DEVICE = green
•
LED (2) OUT = green-> 3SK1 output circuit closed
•
LED (3) IN = green-> 3SK1 switch-on (close) conditions satisfied
–
Input circuit closed
–
Feedback circuit closed
–
Start button where necessary actuated
•
LED (4) SF = OFF
Содержание PM330
Страница 1: ......
Страница 2: ......
Страница 8: ...Table of contents Power Module PM330 6 Hardware Installation Manual 12 2018 A5E32844552B AF ...
Страница 20: ...Introduction Power Module PM330 18 Hardware Installation Manual 12 2018 A5E32844552B AF ...
Страница 146: ...Appendix A 6 Abbreviations Power Module PM330 144 Hardware Installation Manual 12 2018 A5E32844552B AF ...
Страница 149: ......
Страница 150: ......