88/219
Building Technologies
Basic Documentation LMV27...
CC1P7541en
9 Connection to load controllers
17.12.2018
If the external load controller via contacts is not used, it is possible to change to manual
output via the switch for switching from automatic to manual operation; this cuts the
connection to the load controller.
In that case, the LMV27 switches to the external load controller via contact.
A switch for Open/Close or stage 2/stage 3 can then be connected to the load
controller’s terminals.