Commissioning
5.5 Commissioning using the BOP
Control Units CU240S
92
Operating Instructions, 07/2008 - FW 3.2, A5E00766042B AD
5.5.7
Series commissioning using the BOP
Upload and download a parameter set with a BOP
With a BOP a single parameter set can be uploaded from an inverter and then downloaded
into another inverter.
To copy a parameter set from one inverter to another, the following procedure should be
performed.
Upload a parameter set with a BOP
Prerequisites
● An inverter with an appropriate parameter set is available (upload inverter)
● Supply voltage is active for the upload inverter
● The upload inverter is in "Ready to Run".
Parameter
Description
Setting
Fit the BOP to the Inverter - for the parameter set to be uploaded, perform the following
steps:
P0003 = 3
User access level*
1: Standard: Allows access into most frequently used parameters (default)
2: Extended: Allows extended access e.g. to inverter I/O functions
3: Expert: For expert use only
P0010 = 30
Commissioning parameter*
0: Ready (default)1: Quick commissioning
2: Inverter
30: Factory setting, parameter transfer
95: Safety commissioning (for CUs with fail-safe functions only)
P0802 = 1
Transfer data from EEPROM
0: Disabled (default)
1: Start BOP transfer
2: Start MMC Transfer
While the upload is active "bUSY" will be displayed on the BOP and the inverter will not react
to any commands.
If the upload has been completed successfully, P0010 and P0802 will be set to 0 and the
BOP display will return to normal.
If the upload has failed, F00051 (failure while accessing EEPROM), F00055 (failure while
saving parameter on BOP) or F00057 (BOP fault) will be displayed.
In this case attempt another upload or perform a power-cycle to confirm F00051.
After a successful upload disconnect the BOP from the upload inverter to connect it to the
download inverter.