IV319 Rev.00
Data 2010-06-22
Pag. 2 di 118
CONTENTS
1. Safety and EMC instructions ··························································· 6
1.1
I
NSTALLATION
············································································ 6
1.2
O
PERATION
················································································ 7
1.3
M
AINTENANCE
,
SERVICING AND FAULTS
···································· 8
1.4
T
RANSPORT
················································································ 9
1.5
S
TORAGE
···················································································· 9
1.6
S
TANDARDS
··············································································· 9
2.1 Description of commonly used symbols ···································· 10
2.2 Description of commonly used name for phase ······················· 11
3. Introduction ····················································································· 12
3.1
S
YSTEM AND MODEL DESCRIPTION
··········································· 12
3.2
P
RODUCT
S
PECIFICATION AND
P
ERFORMANCE
························· 13
4. Display Panel ··················································································· 16
5. Installation························································································ 20
5.1
U
NPACKING AND
I
NSPECTION
··················································· 20
5.2
I
NPUT AND OUTPUT POWER CORDS AND PROTECTIVE EARTH
GROUND INSTALLATION
·································································· 20
5.3
O
PERATING PROCEDURE FOR CONNECTING THE LONG BACKUP
TIME MODEL
UPS
WITH THE EXTERNAL BATTERY
·························· 25
5.4
P
ARALLEL OPERATION
······························································ 26
6. Operation ························································································· 32
6.1
O
PERATION
M
ODE
··································································· 32
6.2
P
ARALLEL
O
PERATION
····························································· 34
6.3
B
ACKUP TIME FOR THE STANDARD MODEL
······························· 39
7. Battery Maintenance ······································································· 40
8. Notes for Battery Disposal and Battery Replacement ················ 41
9. Trouble Shooting ············································································· 42
Содержание Green Point 6 20KVA
Страница 28: ...IV319 Rev 00 Data 2010 06 22 Pag 28 di 118 Wiring diagram of 6K 10K 1 1 parallel system...
Страница 29: ...IV319 Rev 00 Data 2010 06 22 Pag 29 di 118 Wiring diagram of 10K 3 1 parallel system...
Страница 55: ...IV319 Rev 00 Data 2010 06 22 Pag 55 di 118 STEP 5 The output voltage would be 230VAC after the UPS is turned on...
Страница 57: ...IV319 Rev 00 Data 2010 06 22 Pag 57 di 118 DB 9 Interface of AS400 communication protocol...
Страница 61: ...IV319 Rev 00 Data 2010 06 22 Pag 61 di 118 Back View of 15K 20K 3 1...