INSTALLATION
3
3.3
Overview of assembly steps
3.3.1
Material required
3.3.2
Overview of assembly steps
Assembly material
Part No./reference
Required for
Dowels / screws M5
----
Assembly of G-type rails
El. supply line
see “Preparing the main
power supply”, page 28
Analyzer power connection
El. lines for signals
----
Connection of signal lines
Hose/tube for measured medium
see Operating Instructions
of the cell
Measured medium feed and
drain line
Purge air supply
see Operating Instructions
of the cell
Cells with purge compartments
Tubes for protective gas
Feed and drain for protective
gas.
Tool
Part No./reference
Required for
4 mm Allen key
----
Retaining bracket
5 mm Allen key
----
MCS300P Ex cover
Assembly step
Remark/reference
Determining the installation location
As close as possible to the sampling point.
Fitting position according to System Documenta-
tion.
Fitting the G-type rails
see “Fitting the G-type rails”, page 22
Attaching the analyzer to the G-type rails
see “Fastening the MCS300P Ex on the G-type
rails”, page 22
Connecting the measured medium feed and
drain lines
see “Connecting the tubes of the measured and
test medium”, page 23
Connecting the protective gas feed and drain
lines
see “ Connecting the protective gas”, page 23
Connecting the main power supply
see “Preparing the main power supply”, page 28
Connecting signal lines
see “Connecting signal lines”, page 27
For the “Modbus” option:
Establish a connection via Ethernet.