22
8013741/16LH/V1-7/2020-04| SICK
O P E R A T I N G I N S T R U C T I O N S | MCS300P Ex
Subject to change without notice
3
INSTALLATION
3.4
Assembly
3.4.1
Fitting the G-type rails
1
Unscrew the G-type rails from the MCS300P Ex.
2
Fasten the G-type rails to the wall or installation plate (fitting direction and drilling
diagram,
cont.).
▸
Observe the carrying capacity of approx. 30 kg (plus cell).
▸
Position groove,
) for mounting the MCS300P Ex at the bottom.
3.4.2
Fastening the MCS300P Ex on the G-type rails
Fig. 4: Mounting position (example: horizontal installation)
1
Lift the MCS300P Ex carefully and slot it into the G-type rails.
a)
For horizontal installation:
Fit the sender unit on the left side.
b)
For vertical installation:
Fit the sender unit with the operator panel at the top.
2
Screw the sender unit tight (4 mounting brackets).
3
Screw the receiver unit on loosely so that enough clearance remains for temperature
equalization (4 mounting brackets and cup springs).
CAUTION:
Accident risk through inadequate fastening of the device
▸
Consider the device weight specifications when planning the mounting supports.
▸
Check the load capacity/condition of the wall/rack on/in which the device is to be
installed.
NOTICE:
MCS300P ExThe MCS300P Ex can twist when lifted, especially with long cells.
▸
Use 2 persons to carefully lift the MCS300P Ex.
▸
Avoid twisting or bending.
▸
Do not place the MCS300P Ex on the proportional valve and/or control unit.
NOTICE:
▸
Install the MCS300P Ex in the position specified during project planning for the
MCS300P Ex.
4 mounting brackets
without cup springs
on sender unit
G-type rail
4 mounting
brackets with cup
springs on receiver
unit
Sender unit
(with operator panel)
Receiver unit
“Bottom” groove