64
8013741/16LH/V1-7/2020-04| SICK
O P E R A T I N G I N S T R U C T I O N S | MCS300P Ex
Subject to change without notice
7
MAINTENANCE
5
Tighten the screw connection of the connecting tube again.
Torques:
– Receiver side: 1 Nm (
see “Connecting tube, receiver side”, page 63
)
– Sender side: 2 Nm
6
Screw the 4 mounting brackets and cup springs loosely on the receiver unit so that
enough clearance remains for temperature equalization.
Final steps
1
Screw the tubes for the measured medium back onto the cell.
2
If necessary, connect the electric lines to the cell heating.
3
Perform a leak test (depending on the cell and measured medium used).
4
Put the MCS300P Ex back into operation.
5
Compare the intensity (Menu:
Diagnosis/Check values/Intensity
) with the notes made:
The intensity must not have deteriorated significantly.
If this is the case: Please contact SICK Service.
6
Compare the reference energy (Menu
Diagnosis/Check values/Reference energy
) with
the notes made: The reference energy must not have deteriorated significantly.
If so: Reset reference energy (see Menu:
Reset/Reference energy
).
7
Perform the adjustment of zero point and span point (see Menu
Adjustment
).